Books › As Assumed
As Assumed ยท a novel

Chapter SevenThe Letter of 9 May 2033

Chapter 7 of 183 min read636 words

REFUSAL LETTER, 9 MAY 2033 (sent by me, quoted in full as it bears on everything after) Dear Mrs Okonkwo, Thank you for your application to the Warm Homes Grant. I am sorry to tell you that your property is not eligible. The scheme is open to properties in EPC bands E, F and G. The certificate for 14 Marlow Row, lodged on 4 March 2033, shows band D (score 66). The band reflects the property's construction, heating and insulation. Your walls are recorded as cavity construction, which performs better than solid walls and is the main reason the property sits in band D. Cavity wall insulation would normally be the first measure we would look at, and I am sorry that we cannot fund it at this band. If you believe the certificate is incorrect you may contact the assessor's accreditation body. Yours sincerelyโ€ฆ Every factual statement in that letter is true. The letter is still wrong, and I wrote it.

Your walls are recorded as cavity construction.

Recorded. I chose that word carefully in 2033 and I was quietly pleased with it, because it was precise and it was true and it did not commit me to anything.

โ–

What a reasonable person does with that letter

She reads your walls are cavity construction. The hedge in "recorded as" does not survive contact with a reader, and it was not meant to: it was there to protect me, not to inform her.

Then she reads that cavity performs better than solid, which is the sentence that does the damage, because it tells her the reason she is refused is a good feature of her house.

Mrs Okonkwo believed for two years that her house had cavity walls. She told her daughter so. She stopped mentioning that the back bedroom runs with water in February, because the certificate had explained to her that her walls were the better kind.

โ–

The sentence I should have written

The certificate records your walls as cavity. That is the published default for a house of this age, and the assessor's data shows it was assumed, not established by inspection. If your walls are in fact solid, the band would be lower and you would be eligible. A borescope inspection can settle it for about ninety pounds, and here is how to get one.

That is four sentences. They are all true. They were all true in 2033. I had every one of those facts on the screen in front of me when I wrote the letter I actually sent.

โ–

Why I did not write it

Because the refusal was correct and the letter only had to be correct, and because the scheme has no route for "the certificate may be wrong in this particular way", and because inviting eight hundred people to challenge their certificates is a thing an officer does not do on his own authority.

And because โ€” this is the honest one โ€” I did not know, in 2033, how often the assumption was wrong. I believed the defaults were right nearly always. They are right most of the time. I had no number, so I had no reason to doubt, and so I had no reason to look, and so I had no number.

โ–

The appeal route I pointed her at

You may contact the assessor's accreditation body.

I knew when I wrote that line that it goes nowhere. The ground for a challenge is assessor error, the assessor made no error, and the challenge may be brought by the person who commissioned the certificate, who was the previous owner's estate agent in 2016.

I sent a 71-year-old woman down a corridor I already knew was bricked up. That is not a system fault. That is a paragraph I chose.

All 18 chapters · As Assumed

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.