Books › As Assumed
As Assumed ยท a novel

Chapter FifteenSay So on the Certificate

Chapter 15 of 183 min read662 words

PROPOSAL (R. ELLACOTT, ENERGY EFFICIENCY OFFICER, BRENTWATER DISTRICT COUNCIL โ€” SEPTEMBER 2035) 1. Say so on the certificate. Where an element's value came from an age-band default rather than inspection, the certificate's face carries one word against it: (assumed). WALL-SOURCE already records it. 2. Pass the source fields to the scheme. Any scheme using the band for eligibility receives the existing WALL-SOURCE, ROOF-SOURCE and FLOOR-SOURCE fields with it. No new data is collected. 3. An assumption may not be the sole ground of a refusal. Where the decisive element of a band was assumed, the applicant is offered a funded inspection of that element before the refusal is final. For a wall that is a borescope: ยฃ90. Mechanism: nothing is measured that is not measured today, no band changes, no default changes, no threshold moves. An inference is labelled as an inference, so it cannot be used as a finding. Cost at Brentwater: 268 inspections a year ร— ยฃ90 = ยฃ24,120. Annual programme spend: ยฃ3.32m. 0.7%. Of the 44 we inspected, 41 re-lodged below the threshold. The other 3 got a correct refusal with a reason the household could accept.

One word on a certificate, one field passed along, and ninety pounds before a refusal is final.

โ–

Limb one costs nothing and is the one I would keep

WALL-SOURCE: age-band default exists. The certificate shows the value and not the source. Printing the source is a template change.

It fixes the letter even if nothing else happens, because an applicant who reads Walls: cavity wall, as built (assumed) has been told the truth, and can act on it, and Mrs Okonkwo would have known in March 2033 what she found out in February 2035.

If I could have only one of the three limbs, it is this one, and it is the cheapest thing in this file.

โ–

Limb two is a field, not a system

The scheme's national team told me provenance is not a field they receive. The register operator told me the data is there. Both are true and neither of them can fix it alone, which is the definition of the gap this file is about.

Passing the source fields alongside the band is a change to one interface. It lets a scheme rule distinguish an observed band from a modelled one, which is the thing no scheme rule can currently do.

โ–

Limb three is the one with a price, and the price is 0.7 per cent

Two hundred and sixty-eight inspections a year at ninety pounds. Twenty-four thousand pounds against a three-point-three million pound programme.

I have put that comparison in front of two committees and it is the sentence that moves people: the scheme currently spends nothing to find out whether a refusal is correct, and ยฃ9,000 to act when it is not.

And it is self-limiting. It is not a survey of the district. It fires only where an application has been made, a refusal is about to be issued, and the element that decides it was assumed. Nothing else triggers it.

โ–

Where the bill comes in, and no further

A spend wildly out of step with a band is the cheapest signal I have that a model has lost touch with a building. Under limb three it can be used to order the queue of inspections when there is more demand than budget in a year.

It never decides anything, for every reason in Chapter Thirteen. It picks who gets looked at first. That is all a bill is fit for and it is genuinely useful for that.

โ–

What I am not asking anybody to pay for

Not a band change. Not a threshold change. Not a measured survey. Not a new assessment type, a new qualification, a new register, or a single additional minute in anybody's appointment.

The data exists, the price is ninety pounds, and the refusal currently costs nothing. That asymmetry is the whole proposal.

All 18 chapters · As Assumed

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.