CLEARWATER REGIONAL โ NOTICE OF INVESTIGATION (internal) To: Capt. D. Quigley ยท 17 February 2032 "The Company is required to investigate occurrences independently of any external safety investigation. This process examines compliance with Company procedures. It is not a safety investigation and its findings are not safety findings." Terms of reference: compliance with OM-A 8.1.7 (acceptance of multiple carried-forward items).
Eight days after the diversion, and the sentence that matters is the third one.
It is not a safety investigation. That is true, and it has to be said, and saying it is the airline being correct.
A safety investigation and a disciplinary investigation are different animals with different purposes, and the law keeps them apart on purpose. A safety investigation exists to find out why, so it can be prevented. A disciplinary process exists to decide whether a person complied with their obligations. If you merge them you get neither: people stop telling safety investigators the truth, because the truth gets them fired.
So the company ran its own, and it had to, and it ran it against the only standard it owns โ its operations manual.
What he was asked
The whole internal process turns on one question: did Dermot Quigley satisfy himself as to the combined effect of the unserviceabilities before he accepted that aircraft?
He answered honestly, which in this industry is both a professional obligation and, repeatedly in my experience, a mistake.
He said he had read the page. He said he had registered a fuel item. He said he could not now say whether he had registered three, and that if he was honest he did not think he had thought about them as a group. He said that in nineteen years he had never once seen three items from the same chapter on one page, and the panel noted, correctly, that this was not a reason.
Nobody suggested he lied. Nobody suggested he was rushed by the company, because he was not: the turnaround was adequate and he never claimed otherwise. Nobody suggested he was unfit, tired or careless in any ordinary sense.
The finding was that he accepted the aircraft without the consideration that 8.1.7 required, and on the evidence โ including his own answer โ that finding is correct.
The thing he did not have
He could not say the conditions were not on the page, because at that point nobody knew it mattered. The circularity in the three reliefs had not been found yet. It was found by Dr Thibodeau's team in the autumn of 2032 and published in May 2033.
In February 2032 the fact of the matter was simply that three fuel items were deferred and a commander had signed for them. The defence that would eventually be put in print by the national safety investigator did not exist, in any document, anywhere, at the time he needed it.
It is worth being precise about why not. Nobody was withholding it. The Bureau's investigators spent the spring of 2032 on the coupling itself โ a metallurgical examination, a fleet inspection of the same part, and a review of the manufacturer's service history, which is exactly where you look first when a thing cracks. The deferral question came later, out of a routine review of the aircraft's technical state, and it took months because it required somebody to read three MEL entries against each other and notice a circle.
That is the ordinary sequence of an investigation. The hardware first, because the hardware is what failed. The paper afterwards, because the paper is what let the hardware's failure go unseen.