CLEARWATER REGIONAL โ OCCURRENCE FILE A32-019, PERSONNEL SUMMARY Commander D. Quigley โ employment terminated 14 June 2032; licence endorsed. First Officer A. Nakashima โ no action; returned to line duty 2 March 2032. AME L. Baptiste โ no action; deferrals verified as correctly raised and applied. Maintenance Control โ no action. Technical Publications (MEL) โ no action.
Five lines. One of them ends a career and four of them are two words long.
I am the fifth line.
Why Nakashima was fine, and should have been
Avery Nakashima witnessed the dripstick she was not required to witness, kept the fuel log the MEL demanded, said on the plan in a way that told her captain exactly what the number was worth, and flew a single-engine approach into Thunder Bay in February as a 29-year-old with 2,100 hours.
She also did not notice three ATA 28 deferrals on the page, and nobody asked her about it, because 8.1.7 places the consideration on the commander and she is not the commander. The obligation is singular. There is no provision anywhere in that manual for a first officer to form a view about carried-forward items; she is not required to, and had she objected she would have been outside her role.
So the person sitting eighteen inches to his right, looking at the same page, carrying the same consequences, had no duty to see what he was fired for not seeing.
That is not a flaw I can see how to fix. Command has to be singular or it is not command. I record it because the five lines above are the clearest statement I know of what this structure does: it places the entire weight of a judgement on one person and then, when the judgement fails, finds that only that person has failed โ which is true, because only that person had the duty.
Why Baptiste was fine, and should have been
Lucien Baptiste raised three deferrals over six days. For each one, the maintenance system printed him the relief conditions, and for each one he checked them against the aircraft's state and found them satisfied.
Think about what that means. When he raised 28-46-02 on 5 February โ the fuel-used indication โ the relief required that both tank quantity indications be operative. One of them was not. It had been deferred three days earlier, by him.
The investigation examined this and found he had applied the system correctly, and he had. The maintenance system checks relief conditions against the recorded serviceability status of the named systems, and 28-41-01 had been raised against the No.2 tank indication, which the system holds as a separate line item from the tank quantity system named in 28-46-02's condition (a).
Two entries, two codes, and the check passed. Not a bug. The codes refer to different things at different levels of the breakdown and both references are correct in their own documents.
He asked, at interview, whether he should have caught it. Dr Thibodeau told him that nothing in his procedure would have shown it to him. He asked again anyway. I know how he feels.