MY OWN BOOK โ€” sole practitioners who ceased practice, 2001โ€“2036 Sole practitioners on my book who retired or ceased: 23. Bought six-year run-off: 19. Bought longer than six (one architect, seven years, 2014): 1. Bought none: 3. Claims notified during run-off: 6 โ€” all covered, all settled or dropped. Claims arriving after run-off expired: 4 โ€” none covered. Of those 4: work was done between 7 and 11 years before the claim was made. All four involved a defect not reasonably discoverable at the time.

Twenty-three people over thirty-five years. Six claims caught by the product and four that arrived behind it.

That ratio is the honest case for the current arrangement, and I want it stated before the criticism: six years of run-off catches six out of ten claims against retired practitioners on my book. It is not a token. It is a product that mostly works.

โ–

The four

A structural engineer, 2009: a retaining wall design, claim in year eight. Settled personally at ยฃ31,000 out of the sale of a second property.

A surveyor, 2016: a valuation for a lender, claim in year nine when the lender's book was reviewed after a portfolio sale. ยฃ44,000. He had the money and paid it, and told me it was the deposit he had promised his daughter.

An architect, 2021: fire compartmentation detailing in a converted mill, discovered on a later refurbishment in year ten. The claim was eventually brought against the contractor instead, for reasons of practicality rather than merit, and he paid nothing. That is the fourth one I promised in Chapter Two, and he was lucky rather than protected.

And Hugh Caddick.

All four of them had bought the run-off. All four bought the maximum available. Not one of the four was uninsured through carelessness, and in thirty-five years I have never had a claim arrive after run-off against somebody who skipped it โ€” which is a small sample and a strange statistic and I have thought about it a good deal.

โ–

What the pattern says

The claims that arrive after run-off are not random. Every one of the four is a latent defect: a wall, a valuation on a property whose problems surfaced slowly, fire detailing hidden behind plasterboard, a beam behind render.

That is Chapter Six's point in the form of a table. The run-off period is measured from cessation against the ordinary limitation clock, and the claims that land outside it are the ones running on the knowledge clock instead โ€” which is to say, the ones about things nobody could see.

The product's coverage and the claims' nature are selected against each other. Not by anybody's design. The six-year figure is correct about limitation; the latent damage rule is correct about fairness to claimants; and the intersection of the two is a category of claim that reliably falls into the gap.

Four in thirty-five years, on one broker's book. I do not know the national figure. Nobody does, as far as I can establish, and Chapter Fourteen is about that.