LEAD SAMPLE RESULT โ 2B GLENVARRA ROAD. 11 APRIL 2033 Sample type: random daytime, consumer tap (requested by occupier). Lead: 18 ยตg/l. Standard: 10 ยตg/l. Pipework established by excavation at the boundary, 2 May 2033: lead communication pipe (company-owned, 4.1 m) and lead supply pipe (privately owned, 11 m, running under the front path and into a 1936 conversion). Action taken: company communication pipe replaced in MDPE, 19 May 2033. Follow-up sample, 4 July 2033: 24 ยตg/l. Advice issued to occupier: run the tap for 2 minutes before drinking; do not use first-draw water for infant formula. Signed: I. Sarpong, Water Quality Manager.
Eighteen micrograms per litre before we did anything. Twenty-four after.
I authorised that replacement. It was lawful, it was our own asset, it was the only thing we were permitted to do, and it made the water worse.
Why it made it worse
Two reasons, both well documented and neither of them a surprise to anybody in my profession.
Disturbance. Cutting into a lead run shakes loose the scale on the inside of the remaining pipe. That scale is where decades of lead sits, bound up and mostly stable, and when it comes off it comes off as particles.
Galvanic coupling. Where a new copper or plastic fitting joins old lead, the junction can accelerate corrosion of the lead side. It is the same chemistry as a sacrificial anode, running the wrong way.
Both effects decay. Twenty-four micrograms in July was nine in October and six by February. A partial replacement is a spike followed by a slow improvement, and the spike lands on whoever is drinking the water that summer.
At 2B Glenvarra Road that was a two-year-old.
Who I am
Imelda Sarpong. I am forty-eight and I am water quality manager for Mereside Water, which supplies one million four hundred thousand properties. I have done this job for nine years and been in the industry for twenty-three.
I sign the regulatory returns. I write the letters to customers. I set the sampling programme and I authorise the lead replacement policy.
The two numbers in this book
We estimate two hundred and eighteen thousand of our properties have lead somewhere in the supply. Of those:
Thirty-one thousand have lead only on our side of the boundary. We replace those, and the result is unambiguously good.
Ninety-four thousand have lead only on the customer's side. We cannot touch those at all.
Ninety-three thousand have lead on both sides. Those are the ones in this book, and for every single one of them our only lawful intervention is the one that made 2B Glenvarra Road worse.
The boundary
Our pipe is called the communication pipe. It runs from the main in the street to the boundary of the property, usually to a stop tap under a small iron cover on the pavement.
From that stop tap inwards it is the supply pipe, and it belongs to the owner of the property. We do not own it, do not maintain it, have no right to work on it, and have no power to require anybody to replace it.
That boundary is in the right place. A water company with a duty over private plumbing would have an unbounded liability, no control over the fabric it was liable for, and no right of entry; and the cost would fall on all one point four million customers for the benefit of some. I will spend a chapter on why I would not move it.
And the lead pipe at 2B Glenvarra Road does not know the boundary is there. It is fifteen metres of continuous lead with an administrative line four metres along it.
What I am not going to argue
That the standard is too strict. Ten micrograms is already a compromise; the health evidence supports lower, and there is no safe level.
That we have been negligent. Mereside has replaced fourteen thousand two hundred communication pipes since 2019 and doses orthophosphate at all forty-one of its treatment works, and both are the right things to do.
That anybody at 2B Glenvarra Road did anything wrong. The tenant asked for a sample. That is the most proactive thing any customer of mine has ever done about lead, and the system's answer was to put a figure of twenty-four on her kitchen tap.