Books › Compliance Notice
Compliance Notice ยท a novel

Chapter FiveNinety-Six Pages

Chapter 5 of 183 min read696 words

SAFETY CASE REPORT โ€” HARTSMERE COURT, SUBMITTED 14 JUNE 2032. ASSESSMENT SUMMARY (N. BRIGHTWELL) Length: 96 pages, prepared by the Principal Accountable Person without external authorship. Fire strategy: present (1996 original, annotated). Fire risk assessment: present, July 2031, suitable and sufficient. Disclosed by the Accountable Person, unprompted: no fire risk appraisal of external walls; no compartmentation survey; 118 of 164 flat entrance doors identified as non-compliant following a door-by-door inspection carried out by the directors in 2031; dry riser outlet on level 7 obstructed; smoke control dampers never tested; no record of any compartmentation work since 1996. Resident engagement strategy: present. Response rate to the directors' own door survey: 164 of 164 flats โ€” achieved by knocking on doors over six weekends. Assessment outcome: further information required. Compliance notice to follow if no programme is submitted.

Ninety-six pages written by four volunteers, disclosing six things none of which I would have found without them, including the one that led to my notice.

โ–

How the door figure came to exist

They counted.

There is no requirement for an accountable person to inspect every flat entrance door. The requirement is to assess and manage the risk, and a proportionate approach for a 1996 block would have been a sample โ€” twenty per cent, which is the convention, and which my team routinely accepts.

A twenty per cent sample of Hartsmere Court would have found about twenty-four non-compliant doors out of thirty-three inspected, and the report would have said sampling indicates a significant proportion of flat entrance doors require attention; a full inspection is programmed.

That report would not have produced a compliance notice. It would have produced a letter and a twelve-month programme and I would have been satisfied.

Instead, four directors knocked on a hundred and sixty-four doors over six weekends in 2031, got into every single flat, photographed every door, and wrote down a number.

โ–

The number that cannot be unwritten

A hundred and eighteen.

Once it is in a safety case report it is a known, quantified, documented contravention. There is no version of my job in which I read 118 of 164 non-compliant and respond with a twelve-month programme and a friendly letter, because if there is a fire in the meantime that figure will be read out at an inquest and the next question will be what the Regulator did about it.

Their thoroughness converted a manageable generality into an unignorable fact, and the unignorable fact is what I enforced against.

โ–

What the commercially-owned building down the road submitted

I am going to describe a real report in general terms because the comparison is the point of this book.

Another eleven-storey block, same era, same construction type, same single staircase, three miles away, owned by an investment company and managed by a national agent. Safety case report: two hundred and forty pages, prepared by a specialist consultancy, structurally excellent, every required heading addressed.

Flat entrance doors: "A sampling regime has been implemented in accordance with recognised guidance. Findings are being addressed through the planned maintenance programme."

No number. No disclosure of what the sample found. Nothing I can serve a notice about, because the report complies: a sampling regime is recognised guidance and a planned maintenance programme is a programme.

I asked for the sample results. I received them in nine weeks, after two reminders, and they indicated a non-compliance rate of about seventy per cent.

Which is almost exactly Hartsmere Court's seventy-two per cent. One building has a compliance notice and the other has a certificate.

โ–

What I want to be clear about

The consultancy did nothing wrong. Sampling is proper. A planned maintenance programme is a legitimate answer. The agent answered my question when I asked it, and the figure was not concealed โ€” it was simply not volunteered, and nothing requires it to be.

The difference between the two buildings is not safety, management quality, or even candour in any blameworthy sense. It is that one of them was written by professionals who know exactly what the regime requires and the other was written by a retired lecturer who thought she should tell me everything.

All 18 chapters · Compliance Notice

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.