COMPLIANCE NOTICE โ [BUILDING WITHHELD]. SERVED 9 OCTOBER 2034 To: [Company] Ltd, Principal Accountable Person. Nominated individual: none recorded in post. Served by post to the registered office, being the address of a company secretarial service. Directors at Companies House: none since 11 August 2032. Contraventions: no safety case report; no fire risk appraisal of external walls; no compartmentation survey; dry riser inlet sealed during pavement works and not reinstated; fire door to stair at level 4 wedged open at inspection; stair cupboard used for storage of flammable materials. Steps required by 9 April 2035. Contravention of this notice is an offence. Note by inspector: "There is no person to whom this notice can meaningfully be addressed. It is served so that the record shows it was served." N. Brightwell.
I served a notice on nobody and wrote down that I had done it.
Why I did that
Because the alternative is a file in which the Regulator inspected a building in June 2033, found a sealed dry riser inlet and a wedged stair door in a nine-storey block of thirty-one flats, and took no formal action for sixteen months.
The notice will not be read. There is no director to read it, no agent instructed to act on it, and the company secretarial service will file it. In April 2035 it will be contravened and there will be no officer to pursue and a company with no assets to fine.
It is a document whose only function is to be in the record, and I am including it as the last document in this file because it is the exact opposite of the first one, and the two of them are the same regime.
The first notice went to four people who had counted a hundred and sixty-four doors. The last one went to nobody at all.
What happened at Hartsmere Court
The doors were approved in June 2033, on the third consultation, at one thousand four hundred and eighteen pounds a flat a year over four years. Thirty-one doors were replaced in 2033/34 and a further twenty-nine are programmed for 2034/35.
The external wall appraisal was carried out in March 2034 and found the wall acceptable, as expected, at a cost of thirty-eight thousand pounds the leaseholders had to fund in order to be told that nothing was wrong.
The compartmentation survey is unfunded and the dampers have still never been tested. The company remains in contravention and I have extended the notice twice, which is a thing I am permitted to do and which is the whole of my discretion.
Gwenno Trahair is still the nominated individual. There are three directors now; a leaseholder in flat 44 stood in 2034 after Mr Oduya left. She told me, when we last spoke, that she intends to stay until the certificate, and that she has a date in her diary in 2037, and that she is fifty-nine.
What I sent, and to whom
In October 2034 I sent the analysis in Chapter Eleven, the resignation figures in Chapter Twelve, and the proposal in Chapter Fifteen to the directorate, to the sponsoring department, and to the two leaseholder organisations that had asked me to speak at an event.
The directorate noted it and asked, again, whether the figures could be validated from systems rather than from my spreadsheet, which they cannot, which is limb one of the proposal.
The department replied that the register's content is prescribed by regulations which are kept under review.
The leaseholder organisations both asked me to campaign for exemption, which is Chapter Seventeen, and I declined, and one of them was gracious about it and one was not.
What I would say to the next inspector
Serve the notices. All of them, including the ones that will be read by nobody, and write in the file why.
But count the thing nobody counts. Cross-reference the register against Companies House and find out who your duty holders actually are, because the system will not tell you, and until you have done it you will believe โ as I did for a year โ that you are enforcing against the worst buildings.
You are enforcing against the ones that told you. Sixteen per cent of the stock and two-thirds of the notices, and the difference is not safety and it is not even candour in any blameworthy sense. It is that some of these reports were written by consultancies who know exactly what is required, and some were written by a retired lecturer who thought she should tell you everything.
Thirty-eight directors resigned after my team's forty-seven notices. Six buildings were left with nobody. Three of them still have nobody, and they are the least safe buildings I am responsible for, and they arrived in that condition because the regime worked.
A hundred and eighteen doors. Fifty-two households. Four volunteers, then three.