TESTS SATISFIED BY A PREDICTION (M. DAHLGREN, 2034 โ four examples from my own survey practice) Zone allowance. Test: will she be at her winter mark at the boundary? Satisfied by: a projected consumption. Outturn recorded: in 9 of 184. Minimum bunkers on departure. Test: has she sufficient fuel for the intended voyage plus reserve? Satisfied by: a projected consumption. Outturn recorded: on arrival, as a quantity remaining โ compared with the projection by nobody. Stability on arrival condition. Test: will she satisfy the criteria at the end of the voyage with tanks slack? Satisfied by: a calculated arrival condition. Outturn verified: never. Lifeboat davit load test interval. Test: within five years. Satisfied by: a date. Outturn: a fact, checked at every survey. Pattern: where a test is satisfied by a prediction, no outturn is recorded. Where it is satisfied by a fact, the fact is checked.
Three predictions and a date. The date gets checked at every survey by every surveyor on earth. The three predictions get checked by nobody, ever.
Why predictions are used at all
Because some things cannot be tested at the moment the duty attaches.
A ship is loaded in port and the condition being regulated occurs at sea. A ship bunkers in port and the sufficiency of her fuel is a fact about a passage she has not made. Her arrival stability is a fact about a condition she will not reach for a fortnight.
You cannot test any of those at the berth. So you test a forecast of them, and you require the forecast to be made competently, by a qualified person, using approved software and the ship's own data.
That is a sound and inevitable design. I approve the software. I would not replace it.
And why the outturn disappears
Because the duty is discharged by making the forecast.
Read the allowance rule again: provided due allowance is made. The obligation is to make the allowance โ to perform the calculation properly. It is not, on its face, an obligation to be at the right draught at the line.
So a chief officer who prepares a competent calculation has done the thing the rule requires of him. If the ship is subsequently over her marks, the rule's requirement was still satisfied at the moment it applied, which is one reading of the convention and is a reading I have heard from two very good lawyers.
The other reading is that the prohibition on being loaded so as to submerge the mark is absolute, and the allowance is merely the mechanism by which she becomes compliant in time.
I think the second reading is right. I note that under either reading, nobody records what happened.
The lifeboat davit, which is the control case
A davit load test is due within five years. The test is satisfied by a fact โ a date on a certificate โ and so it is checked, by me, at every survey, in about forty seconds.
It is checked because it is checkable. There is a document, the document records an event that happened, and the event either happened in time or did not.
There is no version of davit testing in which a ship presents me with a projection of when she will have the test done and I mark the item satisfied. And yet that is precisely what happens with the zone allowance, every voyage, on every ship in the world.
The general shape
I have come to think this is not a load line problem.
A test satisfied by a prediction is a test about the quality of somebody's forecasting, and a test satisfied by a fact is a test about the world. Both are legitimate. They are not the same kind of thing, and the regulatory architecture treats them identically: a tick in a box, a signature, an item marked satisfied.
And because they are treated identically, nobody has ever noticed that for one whole class of requirements the quantity the rule exists to control is never measured.
Not under-measured. Not sampled. Never measured, by anybody, anywhere, in the history of the requirement โ and I can say that about the zone allowance with some confidence, because I asked four other administrations and none of them holds a single recorded boundary draught either.