SURVEY SHEET โ MOSSBANK NO. 2, 16 February 2027 Approach: field path from the north, descending through a cutting lip; from the south, across a pasture gate. Sighting, looking east (down direction): restricted by cutting and vegetation to 250 m. At 100 mph a train covers 250 m in 5.6 seconds. Sighting, looking west: 400 m โ 9.0 seconds. Crossing width 4.1 m; time to cross at an elderly walking pace with a dog: 7 seconds. Decision point: a user must judge, from the stile, whether to commit.
Nine seconds one way, five point six the other, and seven seconds to get across.
Those numbers mean that a person at Mossbank No. 2 who looks east, sees nothing, and starts walking can be hit by a train that was out of sight when they decided.
That is not a hypothetical. It is the arithmetic of the site, it was in my 2027 assessment in those words, and it is why the individual risk is third of four hundred and twelve.
Why the sighting is what it is
The line was resignalled in 2019 and the permitted speed raised from 75 to 100 mph.
That was a proper scheme, properly assessed, and it delivered a faster railway on a route that needed one. The crossing assessments were redone as part of it and Mossbank No. 2's risk score went up, as you would expect: the same sighting distance at a higher speed is less time.
The scheme included risk mitigation at seven crossings on the route. Mossbank No. 2 was not one of the seven, because the seven were selected on collective risk, and Mossbank has fourteen users a day.
So the crossing became substantially more dangerous per user, lawfully, as part of a scheme that was a net benefit to everybody, and the thing that made it more dangerous โ the higher speed โ is also the thing that makes closing it more valuable to the railway, and neither of those facts moved it up the queue.
What can be done cheaply, and was
Vegetation clearance, 2027 and again in 2030: improved the eastern sighting from 190 m to 250 m. Cost about four thousand pounds. It is in my assessment as a mitigation and it took the individual risk from fourth-worst to third-worst, which tells you how little it achieved.
New gates and anti-trespass panels, 2028: six thousand pounds.
A whistle board was considered and rejected, because the crossing is 400 m from a village and the noise objection was certain. I agreed with that decision at the time and I have since thought about it a great deal, because a whistle board costs nine hundred pounds and would have given a user the only warning the site is capable of providing.