Books › Extinguishment
Extinguishment ยท a novel

Chapter EightThe Alternative I Offered

Chapter 8 of 182 min read473 words

APPLICATION FOR AN EXTINGUISHMENT ORDER โ€” 20 March 2029 (grounds, extract) The crossing presents a high individual risk to users: sighting time 9 seconds against a crossing time of 7 seconds, at a line speed of 100 mph. An alternative route is available via Mossbank Lane, a distance of 1.9 km, of which 600 m is on an unlit carriageway with no footway, subject to a 60 mph limit. The applicant submits that the extinguishment is expedient in the interests of public safety.

That is the application and the second paragraph is the whole weakness of it, and I wrote it myself because it was true and there was nothing better to write.

โ–

What I was asking an inspector to accept

That it is safer for a walker to go 1.9 kilometres round, including 600 metres on a national-speed-limit lane with no footway, than to cross two tracks in seven seconds.

I believed that then and I believe it now, and the arithmetic supports it: the exposure on that lane is real but the risk per kilometre of rural road walking is lower, by a wide margin, than a 100 mph crossing with nine seconds.

But I was asking him to take it on my model's word, against something a person can see with their own eyes. A country lane with no pavement looks dangerous. A gate, a stile and a flat crossing on a quiet-looking railway does not look like anything at all, which is precisely the problem with it.

โ–

What the railway could have offered and did not

A bridge. Option 1, one point four million pounds, which would have made the application almost unopposable: close the crossing, here is a bridge in the same place, nobody walks an extra metre.

I did not offer it because it had failed the appraisal nine months earlier, and I could not promise money I had been refused.

So the application went in offering a detour, and the objectors โ€” correctly โ€” attacked the detour, and the inquiry was about the detour, and the nine seconds were evidence in support of a case about a road.

The strongest fact I had was not the thing being decided.

โ–

Why not apply for the bridge and the order together

I tried. The answer, which is reasonable, is that the route cannot promise a one point four million pound scheme that is not in a funded programme, and that promising it at an inquiry and then failing to deliver would be worse than not promising it.

I asked whether the order could be conditional on the bridge being built. It can, in principle. It would also mean the railway committing to build a bridge it had assessed as poor value, in order to obtain an order whose purpose was to avoid building one.

All 18 chapters · Extinguishment

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.