CONSULTATION 1 โ 7 OCTOBER 2034 TO 6 JANUARY 2035 Twelve weeks. Nine public meetings. Online form, paper form, Braille, large print, Polish, Urdu, Romanian. Responses: 9,340. Individual and substantive: 2,116. Petition signatures and standard-form responses: 7,224. Cost: ยฃ148,000 โ staff ยฃ71,000, independent analysis ยฃ38,000, venues and printing ยฃ24,000, translation and accessible formats ยฃ15,000.
Nine thousand three hundred and forty is a very large response for a county consultation. The previous record in this authority was eleven hundred, for a bus review.
What the ยฃ148,000 bought
People ask why a consultation costs that and the honest answer is that most of it is not the asking, it is the listening.
The independent analysis is thirty-eight thousand pounds because 2,116 free-text responses have to be read โ actually read, by a person, and coded โ and a body that says it has conscientiously taken responses into account without anybody having read them is lying and will be caught.
The nine public meetings cost about two thousand each by the time you have a venue, a hearing loop, two officers on overtime and a note-taker. I have never run one that was pleasant. I have never run one that was useless either.
What came back
The petition signatures said save our libraries, which is a real thing to say and which I am not going to be sniffy about. Seven thousand two hundred and twenty-four people in this county took a position.
The 2,116 said more.
The coding produced eleven themes. Nine of them were anticipated โ the value of libraries, the effect on children, transport difficulties, the elderly, the digitally excluded, the inadequacy of cost per visit as a measure, and so on. Officers had expected all nine and the consultation document had addressed most of them in advance.
Two were not anticipated, and they are the two that changed the proposal.
The first: what the buildings are used for
Four hundred and twelve responses described using a library for something that is not borrowing a book and is not recorded anywhere.
The literacy scheme at Netherfold, run by a charity, in a room the library lets them have free, two hundred and forty adults a week.
A dementia cafรฉ at Oxhey Cross. A health visitor's drop-in at Marsden Row. The county's only public lavatory in three villages. Two branches where the parish council holds its meetings. One where the food bank does its intake interviews because it is the only private room in the village that is not a church.
None of that is in the statistics. All of it would end with the building.
The second: the cost per visit is partly an artefact
Ninety-one responses, several of them from retired local-government officers, made a technical point that nobody in the building had made.
Cost per visit includes the building. Six of the nine proposed closures are in buildings the council owns and will continue to own, because they are village halls, or share a site with something else, or cannot be sold.
Closing the library does not remove the building cost. It removes the library from the building. The saving on those six is therefore smaller than the model says, and the finance team confirmed it in February, and the figure was ยฃ181,000 smaller.