The chancel is twenty-three feet by thirty-one, late thirteenth century in the main walls, with a roof of 1847 and a south wall that has been moving since at least 1971.
The quinquennial
Every church in England is inspected every five years by an architect. Ours was inspected in October 2012 and the report runs to forty-one pages, of which eleven concern the chancel.
The south wall has a vertical crack from the sill of the second window to within four courses of the ground. It has been monitored with tell-tales since 1998. Two of the three have fractured since the last inspection.
The roof covering is at the end of its life. The 1847 timbers are sound apart from two rafter feet. The east window tracery is weathering to the point where the architect will not guarantee the glass beyond the next inspection.
ยฃ410,000 for the whole. ยฃ186,000 for what cannot wait.
What the Council has
ยฃ11,800 in the general fund.
Our income is ยฃ47,000 a year and ยฃ31,000 of it goes to the diocese as the parish share, which pays for the priest, and which we have never failed to pay in full and are rather proud of.
That leaves ยฃ16,000 a year for insurance, heat, light, the organ, the grass and the fabric of a Grade I building.
At ยฃ16,000 a year, with nothing else going wrong anywhere, the urgent works alone are eleven and a half years of everything we have.
The honest position about need
I want to be careful here because it is the thing the ninety-four would most reasonably ask.
We are not inventing a crisis in order to raise money. The crack is real and I have put my hand in it. The architect is a conservation specialist with no interest in exaggeration and his language is restrained throughout.
But the chancel is not falling down this year, or next. The urgent works are urgent on a five-year horizon. If we did nothing until 2018 the building would still be standing and the repairs would cost more.
So the position in July 2013 was this: a real need, on a timescale of years, against a legal deadline falling in fourteen weeks, with a liability we had known about for four months and the ninety-four had not been told about at all.
Why the deadline and the need do not line up
They have nothing to do with each other. That is the part that took me longest to see and it is the hinge of everything that follows.
The deadline is a provision of the Land Registration Act 2002. It has no connection to the state of any roof anywhere. It applies on the same Sunday to every parish in England, whether its chancel is perfect or in ruins.
If the deadline did not exist, this Council would have had ten years to think, to raise money, to see whether the wall moved, to talk to the ninety-four, and to use the liability โ if at all โ as a last resort against an actual bill.
The deadline converts a decision that ought to be taken when the money is needed into a decision that must be taken now, in the dark, on an estimate, about people who do not know they are involved.