Days 6โ9 โ Tuesday 27 April to Friday 30 April
The reason Dyer Mill Dam was Class II from 1979 to 2016 was twenty-two trailers.
Ridgeline Court sat at the bottom of the hill on the state route, on the flat, in the old creek bottom, which is where trailer courts go in that part of Ohio because it is the land nobody else wants. Twenty-two pads. Fifty-one people in the 2010 count. Four hundred and ten feet downstream of the toe of a fifty-four foot earthen dam.
R. T. Vanlandingham had drawn those twenty-two rectangles on his mylar in 1979 and written 22 MOBILE HOME PADS next to them, and on the strength of those rectangles the state had inspected Dyer Mill Dam every two years for thirty-seven years.
Ridgeline Court closed in September of 2015.
Merle Tacey spent three days on that, because he wanted to be sure he understood it before he said anything to anyone.
The owner died in 2013. The estate sold the parcel in 2014 to a man in Akron who wanted the road frontage. The septic system had been on a variance since 2004 and the health department would not renew it for a new owner, and in September 2015 the remaining eighteen households were given sixty days.
Arzelia Monk knew where most of them went, because she was the one who had processed the address changes.
Nine households moved into Hollis Fork. Four went to Dover. Two went to Michigan. One moved in with a daughter in Coshocton. Two she lost track of entirely.
The pads were scraped in the spring of 2016 and the parcel is hay now, and if you drive the state route past the toe of Dyer Mill Dam today you can still see the pad outlines in the grass in a low sun, twenty-two of them, in two rows.
The state engineer came out in June of 2016 for a routine biennial inspection and found a satisfactory dam and an empty field.
And she did what the method told her to do.
Merle Tacey, who had been an instrument man and then a party chief for a survey firm, understood something about this that a lot of people in Cantwell County would not understand for another year, and it is this:
That was honest arithmetic.
The hazard class of a dam is a statement about who is downstream. On the nineteenth of July 2016, nobody was downstream of Dyer Mill Dam. Fifty-one people had been downstream of it in 2010 and in July 2016 the field was hay, and a state with eleven hundred regulated dams and four engineers cannot inspect hay every two years when there are high-hazard structures above towns waiting their turn.
The reclassification memo was two pages and the second page had a sentence in it that Merle came to think of as the most honest sentence in the entire file:
Should residential development occur within the mapped inundation limit, the classification should be revisited.
Should residential development occur.
It occurred. It occurred in 2019, three years later, four miles of road away and half a mile east, on the quarry bench โ on higher, drier, better ground than Ridgeline Court had ever been, which is exactly why a developer could get it platted and a lender could write seventy-one mortgages on it.
And nobody revisited anything, because revisiting it was not anybody's job, and because the one sentence in the file that asked for it had been written by an engineer in Columbus who would have had to somehow learn, on her own, from two hundred and ten miles away, that a subdivision had been recorded in a county she had no reason to look at again for five years.
On Friday he drove out and parked on the state route and walked the hay field.
It took him twenty minutes to find the pad corners with his boot. Then he stood at the toe of the dam in the grass and turned around and looked up at it, which is the angle nobody looks at a dam from, and which is the only angle that tells you anything.
Fifty-four feet of 1972 earthfill. A concrete spillway on the right abutment with a crest at 1,042.00 and a stilling basin with willow growing out of the joints. A toe drain outfall with clean water coming out of it, which is good news, and which he checked because it is free to check.
Then he turned back around and looked east, up the hill, half a mile, at the rooflines of Quarry Bend showing over the ridge of the bench in the late sun.
Seventy-one roofs.
And he thought about the thing that had been bothering him since Monday, which was not malice and not laziness, because there was none of either in that file.
It was that the state had written down, in 2016, the exact condition under which the dam became dangerous again โ should residential development occur โ and had built no mechanism of any kind for finding out whether it had.
The county knew. The county had platted it. The county auditor had put seventy-one parcels on the tax duplicate and mailed seventy-one bills a year for eight years. The county recorder had the plat in a drawer. The county health department had permitted seventy-one septic systems and the county engineer had accepted a road.
Cantwell County, Ohio, knew about Quarry Bend in nine separate offices.
And not one of those nine offices had any reason on earth to tell the state dam safety program, because not one of them knew the dam was there in that way โ as a thing with a class, and a class with conditions.
Merle Tacey drove home and ate standing up and got out the notebook.
They wrote down the trigger. Nobody wired it to anything.