Books › Low Hazard
Low Hazard ยท a novel

Chapter SixFour Engineers, Eleven Hundred Dams

Chapter 6 of 145 min read1,041 words

Day 19 โ€” Monday, 10 May 2027

Pilar Sowards drove out from Columbus on the tenth of May, two hundred and ten miles, in a state car, and met Merle Tacey at the left abutment at nine in the morning with a hand level, a probe rod and a camera, which told him most of what he needed to know about her before she said anything.

She was fifty-three and she had been a professional engineer for twenty-six years and in dam safety for twenty-two of them. She walked the crest first, upstream shoulder, with the probe rod, which is where you look.

"Show me the tree," she said.

He showed her the tree. She put the hand level on the spillway crest and shot the nail herself and did the arithmetic out loud and got 1,045.00 and said, "That's a good mark."

"You've got a dam here in better shape than two thirds of what I inspect," she said, at the toe, forty minutes later. "Somebody mows this."

"Hoyt Dankworth. He's seventy-nine. He's mowed that embankment with a brush hog every June and September for twenty years."

"That's why there's no trees in the fill. You know what kills these? Trees. A sycamore grows in the downstream face, it dies in thirty years, the root rots out and you've got a pipe through your dam." She took a photograph of the toe drain outfall. "Clean water. He's done you a bigger favour than the state has."

โ–

They sat in the state car at the end of the service road with the windows down and she opened a laptop on her knees.

"You've read 4.2."

"Four times."

"Then I'll skip the part where I explain it." She turned the screen. "This is what I had in front of me in July 2016. This is the whole thing."

It was a map, and a table, and the table had two rows in it, and the rows were census blocks, and the right-hand column was headed PAR CONTRIBUTION, and both rows said 0.

"I didn't miss Quarry Bend," said Pilar Sowards. "Quarry Bend did not exist. It was platted in October 2018. I was out there in June 2016. There was a scraped trailer court and a hay field and a hole in the ground."

"I know."

"You know, but I want it said, because by August you're going to be in front of a newspaper and I would rather you be accurate." She closed the laptop. "The 2016 memo was correct. I'd write it the same way today with the same information."

"I agree with you."

She looked at him sideways.

"You agree with me."

"Ms. Sowards, I was nineteen years on a survey crew. If you hand me a field book and the field book's right, I don't get to be angry at the field book." He looked out the windscreen at the embankment. "I'm not trying to find somebody who did this wrong. I don't think anybody did. That's what's keeping me up."

โ–

Then he asked her the question he had driven himself half mad with for a week.

"How many engineers are there in your section?"

"Four."

"For how many dams?"

"Eleven hundred and six regulated structures." She said it without any particular weight, the way you say a number you have said at a lot of budget hearings. "Four hundred and ten are Class I or II. Those get annual or biennial, and that's about all four of us can physically do. The other six hundred and ninety-six are Class III and IV."

"Once in five years."

"Once in five years, on paper. In practice it slips."

Merle Tacey turned in the seat.

"How many of those six hundred and ninety-six have had a subdivision platted downstream since the last time anybody drew an inundation map for them?"

Pilar Sowards did not answer right away, and when she did it was not an evasion.

"I don't know," she said. "And I want you to understand that sentence properly, because it's the honest one and it's worse than you think. It isn't that I haven't looked it up. There is no field in my database for when was the inundation map drawn, because inundation mapping isn't required for Class III, so for most of them there's nothing to date. And there is no feed of any kind, from any county, that tells me a plat was recorded. Nothing in the system I run would make that number appear. Somebody would have to go and build it."

"Out of what?"

"Out of eleven hundred county recorder's offices' worth of plat records and whatever inundation mapping exists, which for the low-hazard ones is mostly hand-drawn and mostly in a tube in a courthouse basement somewhere, like yours was." She started the car. "It's about nine months of somebody's life. I've asked for it twice."

"What happened?"

"It went in a queue," said Pilar Sowards. "It's a good queue. There are a hundred and sixty things in it and about eleven of them are more likely to kill somebody next Tuesday than this one."

โ–

She was at the end of the service road with the indicator on when she stopped the car again and put it back in park.

"Mr. Tacey. One more thing and then I'm going to drive two hundred and ten miles. You want this dam reclassified."

"Yes, ma'am."

"Then I have to tell you how that works, and you're going to want to hit something." She turned to face him properly. "To change a hazard class you petition the Division, and the petition has to be supported by a current breach inundation analysis by a professional engineer. Hydrologic routing, dam break model, downstream cross sections, mapped limit. That's the evidence. That's the only evidence the rule recognises."

"All right. What does that cost?"

"For a structure this size, in this terrain? Thirty to forty thousand dollars."

Merle Tacey said, "Cantwell County's EMA budget for the year is thirty-one thousand four hundred dollars, and twenty-eight thousand of it is my salary."

"I know," said Pilar Sowards. "And there is a state grant fund that pays for breach analyses." She put the car in gear. "It's prioritised by hazard class."

All 14 chapters · Low Hazard

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.