AUTHORITY AERONAUTICAL CIRCULAR 02/2030 โ CONTINUOUS FRICTION MEASURING EQUIPMENT (extract) "Correlation between device-reported friction and aeroplane braking performance has been found to be acceptable on compacted snow and ice (r = 0.71) and poor on loose and liquid contaminants, in particular slush and wet snow (r = 0.38). Operators and aerodromes are reminded that friction readings on such contaminants shall not be used as the primary basis for reporting runway condition."
That circular is four years older than the accident. It is public. It is on the Authority's own website today.
On 20 June 2035, Strathbane Airport signed a contract for a continuous friction measuring device, towed, with automatic logging to the operations system, at a cost of ยฃ214,000 including training and the first three years of calibration.
I recommended the purchase. My name is on the business case.
What the device does well
I am not against the machine and I want to be precise about that, because the easy version of this account has me as a man defending craft against instruments, and that man is a fool.
The device measures a real thing. On ice and compacted snow โ the conditions that account for most of our genuinely dangerous mornings in January and February โ it is better than a person. It is repeatable. It does not get tired at the end of a twelve-hour shift, it does not have a bad winter after a bereavement, and it produces a continuous trace down the whole length of the runway instead of three measurements per third. It makes an assessment take four minutes instead of twelve, which means we can afford to do it more often, which is worth more than almost anything else in this account.
It also produces evidence. Every run is logged, time-stamped and kept. When an aeroplane goes off the end at an aerodrome with a device, there is a trace to look at, and the trace is not a recollection.
What it does not do
It does not work on wet snow. The Authority says so in r = 0.38, which for a non-statistical reader means: on the contaminant that was on my runway on 9 March 2034, the number the device gives you and the braking the aeroplane gets are barely related.
Wet snow is the hardest contaminant in the book, because it is the one that changes fastest and the one whose behaviour under a tyre depends on how much of it the tyre can shift. A towed wheel at sixty-five kilometres an hour does not shift what a thirty-four-tonne aeroplane at two hundred and fifty does.
So on the exact morning this accident happened, the device would have been inadmissible as a primary basis for the report. It would have produced a number, the number would have gone in the log, and the code would still have had to be a human being with a wedge and a torch.
I put that in the business case, in paragraph 9, in those words.
The purchase was approved anyway, unanimously, in four minutes, and I have never once been asked about paragraph 9 by anybody, in any meeting, since.