PROPERTY FILE โ 14 RILL COURT, NETHERSTONE Planning permission 07/1884/OUT, outline, 42 dwellings, land at Rill Meadow. Granted 11 November 2008. Flood Risk Assessment submitted; sequential test applied; Environment Agency did not object subject to finished floor levels 600 mm above the 1 in 100 year level plus climate change allowance, and to the defence being maintained. Reserved matters approved March 2010. Development commenced July 2010. Plot 14: completed 17 June 2011. NHBC warranty from that date. Flood Zone: 3a (high probability), benefiting from the Netherstone defence (constructed 1996, standard of protection 1 in 75). Finished floor level: as required. Property has never been flooded above the FFL until 11 January 2034.
Permission in 2008. Completed in 2011. The Scheme's cut-off is 1 January 2009, and it falls exactly between the two.
The estate
Forty-two houses on a meadow between the river and the old railway, built by a national housebuilder that still exists, sold between 2010 and 2012.
Of the forty-two, every single one is excluded from the Scheme, because all forty-two were completed after the date. And every one of them was permitted by a decision taken in November 2008, seven weeks before the date.
If the scaffolding had come down a little sooner on the first phase, some of those houses would be inside the pool and some outside, on the same estate, from the same permission. There is no version of the policy in which that distinction means anything.
The permission was not careless
This is the part I want to be fair about, because the easy version of this story is a cynical authority waving through houses on a washland.
Read the planning record. A flood risk assessment was submitted. The sequential test was applied. The Environment Agency was consulted and did not object, subject to conditions, and the conditions were imposed and complied with: finished floor levels six hundred millimetres above the modelled one-in-a-hundred-year level with a climate change allowance.
The house did what it was designed to do for twenty-three years. In January 2034 the river came over the defence and the water in Kehinde Afolabi's living room was four hundred and ten millimetres deep, which is above a floor that was built six hundred millimetres high for exactly this.
The design was right and the event was bigger than the design. That is not a planning failure; that is what a one-in-seventy-five-year defence means.
What the Environment Agency's non-objection does in my world
Nothing at all.
The Scheme's rule is a date. It does not ask whether the Agency objected, whether the sequential test was passed, whether the floor levels were raised, or whether the development was exactly the kind of carefully conditioned building the planning system is supposed to produce.
A house built badly in a flood zone in 2008 can be ceded. A house built well in a flood zone in 2011, to conditions the Agency itself set, cannot.
That is not an argument that the date should go. A rule that asked me to grade planning decisions would be a rule I could not apply to ninety-six thousand properties, and I will say so properly in Chapter Seventeen.
It is an argument that the date is attached to the wrong event.