Books › Not Ceded
Not Ceded ยท a novel

Chapter EighteenDetermined by Date of Construction

Chapter 18 of 183 min read659 words

RENEWAL NOTICE โ€” 14 RILL COURT, NETHERSTONE. ISSUED 2 MARCH 2036 Policyholder: Mr K. Afolabi. Buildings and contents. Renewal premium: ยฃ3,240.00. Flood excess: ยฃ20,000. All other perils excess: ยฃ350. Change reflects: property-level resilience measures surveyed and verified 14 November 2035 (flood doors, airbrick covers, sump and pump, raised sockets and services, ยฃ12,100) and no claim in the year. This property is not eligible to be ceded to the Scheme. Eligibility is determined by date of construction. 14 Rill Court was completed 17 June 2011. Issued under delegated authority: R. Tiplady.

Nine hundred and forty pounds off, for twelve thousand one hundred pounds of work, and the last line of the notice is the same as last year and will be the same every year for ever.

โ–

What the twelve thousand bought

A real reduction, properly earned. The resilience survey was independent, the measures are the right ones, and our model moved because the expected loss moved. If he floods again at four hundred and ten millimetres, the damage will be a fraction of 2034 and the house will dry in weeks rather than months.

I signed that reduction gladly and I would have gone further if the survey had supported it.

And he is still outside the pool, and his buyer will still ask, and the answer will still be no. Resilience changes the risk. It cannot change the date.

โ–

What happened to the house

Still his. He took it off the market in October 2035 after the second offer collapsed and told the agent he would stay.

He has a fixed rate until 2038. He told me so without being asked, in the same email in which he thanked me for explaining the pricing, which is the kind of thing he does.

โ–

What I sent, and to whom

In December 2035 I sent the analysis in Chapters Eleven and Twelve โ€” the three thousand three hundred and eighty, the seventeen undiscounted resales, the two-and-a-half-thousand-pound premium the flood-zone house sold for โ€” and the single-conjunction proposal in Chapter Fifteen, to the Scheme, to our trade body, and to the department.

The Scheme replied in six weeks and it was the best reply I have had from anybody about anything. It said the construction-date test was adopted because it was administrable at the time, that the permission-date question had been raised during design and parked for want of a dataset, that the 37% figure was higher than they would have guessed, and that they would like the underlying matching.

I sent it. It is with their analytics team.

Our trade body put it on the agenda of a committee that meets quarterly. The department replied that the Scheme's eligibility rules are a matter for the Scheme.

Nobody has disagreed with the analysis. One body has asked for the data. That is further than I expected and it is not a change to the rule.

โ–

What I would say to the next underwriter

Price it honestly. Do not shade a flood premium to be kind โ€” it comes out of somebody poorer and it hides the problem.

Then go and get the planning dates. Nobody holds them, the matching is three weeks of a contractor's time, and until somebody runs it there is no evidence at all about whether this exclusion deters anything. I ran it on nine thousand one hundred properties and the answer was thirty-seven per cent, and that number did not exist in the world before I asked for it.

And when you write the renewal, remember what the last line is doing. Eligibility is determined by date of construction. It is a true sentence, correctly applied, and for three thousand three hundred and eighty households it is charging them for a decision taken before the rule was written, in some cases seven weeks before.

Two hundred and forty-eight thousand. A hundred and seventy-two thousand. Eleven buyers in two hundred who knew.

All 18 chapters · Not Ceded

That is the end of Not Ceded. Your place is kept in this browser.