TREATMENT ESCALATION PLAN โ I. HALLAM. COMPLETED 14 FEBRUARY 2031 Patient: Idris Hallam, 81. Clinical frailty score: 5. CPR: not recommended. Rationale: in the event of cardiorespiratory arrest, CPR would not be successful. Ceiling of treatment: ward-based care. Not for critical care admission. Not for invasive ventilation. Not for renal replacement therapy. Free text (box 7): "Decision made in the context of this episode of severe community-acquired pneumonia with acute deconditioning. To be reviewed if he recovers towards baseline. He was independent with a stick three weeks ago and I would expect him to return to that. I have discussed this with him and with his daughter." Signed: R. Osei-Tutu, Consultant Geriatrician. Status: active. Reviewed: never. Admissions since: 4.
I wrote that form. Every word of it was right on 14 February 2031, including the free text, which I wrote at the bedside and which took me four minutes.
He recovered towards baseline. He went home on 5 March 2031 and walked into my clinic with a stick in May.
The form was never reviewed, because nothing in the system requires anybody to review a form on the day a patient gets better.
What happened on 19 January 2034
He came in with acute cholecystitis โ an inflamed gall bladder, a treatable surgical condition, in an eighty-four-year-old man who was living independently, doing his own shopping, and had a frailty score which on that admission was recorded as 4.
He was treated with antibiotics on a medical ward. He was not referred to the surgical team. He deteriorated, developed a perforation, and died on 30 January 2034.
The escalation plan was read as excluding surgical intervention. It does not say that. It says ward-based care and lists three critical care therapies it excludes. It says nothing about an operation, because on 14 February 2031 the question of an operation did not arise and I was not thinking about one.
Who I am
Raymond Osei-Tutu. I am fifty-six and I am a consultant in geriatric and general internal medicine at Bryncoed General, which has five hundred and twenty beds. I have been a consultant for nineteen years.
I complete, on my own estimate, about a hundred and forty treatment escalation plans a year. I believe in them. I have spent a decade arguing for more of them, better completed, earlier in an admission.
The two numbers in this book
I audited four hundred and twelve escalation plans at Bryncoed in 2034.
Three hundred and eighteen of them had a free-text qualification in box 7 โ a condition, a context, a trigger for review, something the author wanted the next reader to know.
Twenty-nine had been reviewed and amended at any subsequent admission.
And in the eighty sets of notes I read in full, I found sixty-one instances in which a recorded ceiling had been interpreted at a later admission in a way the author of the form had not written.
What I am not going to argue
That escalation plans are a bad idea. Before we had them, frail dying patients received chest compressions in corridors and were admitted to intensive care to die on a ventilator away from their families, because nobody had written anything down. I have seen both. The forms are one of the genuine improvements of my career.
That anybody involved in Idris Hallam's last admission did anything wrong. The medical registrar read the form, correctly understood that this was a patient with a documented ceiling, and managed him on the ward. The consultant on take agreed. Nobody was careless.
That the form was badly written. I have read it perhaps two hundred times looking for the sentence I should have written differently, and the free text is better than most.
The argument is that a document designed to travel loses the reason it was written, because the conclusion fits in a glance and the reason does not โ and three years later the conclusion is all that arrives.