PROPOSAL (R. HALLAMORE, RESEARCH DEVELOPMENT MANAGER, FACULTY OF LIFE SCIENCES โ APRIL 2035) 1. Section 4.3 may be satisfied, in the alternative, by a Facility Feasibility Certificate: a signed statement by the director of an accredited core facility that (a) the applicant's actual material has been assessed, (b) the proposed measurement is technically achievable on that material at the stated specification, and (c) the facility will deliver it at a quoted price held for twelve months. 2. The quoted work is then a funded line in the award, delivered in the first months, with a stop/go review at month four at which the Council may terminate if the measurement does not deliver. 3. The certificate makes no claim about the result. It is a statement about capability, signed by the only party that knows. 4. Nothing else changes. 4.3 stands. Pre-award costs remain ineligible. The feasibility question is still asked, of every applicant, to the same standard. Mechanism: 4.3 asks whether a measurement can be made. It currently accepts only one kind of evidence โ a purchase โ and the proposal adds a second kind: the professional certification of the party who would make it. Cost of a month-four termination on a ยฃ1.24m award: approximately ยฃ41,000. Cost of the present arrangement at this faculty: 157 refusals in five years.
The gate stays. The question stays. What changes is what counts as an answer.
Why the certificate is the right instrument
Because Margit already knows. She has the instruments, she has seen the tissue, she runs this measurement weekly, and she can tell you in ten minutes whether it will work on a given sample type at a given depth.
That knowledge is the thing section 4.3 is trying to obtain, and at present the only way the Council will accept it is to pay her ยฃ14,600 to demonstrate it. The proposal lets her simply say it, under her signature, with her facility's name on it and a price attached.
And note her own limit, which is the whole safeguard: I would not sign a prediction of a result. The certificate says the assay will run. It says nothing about the biology. That is exactly the distinction Referee 2 made in Chapter Seven, and the proposal is built on the referee's side of it.
Why the month-four review is not a concession
It is the part I would fight hardest for, because it is what protects the 2029 Review's achievement.
Under the present rule, the Council learns that a method does not work before it commits. Under the proposal it learns at month four, on about ยฃ41,000 of a ยฃ1.24 million award. That is not free and I am not pretending it is.
But it is a thirtieth of the award, against a rule that currently excludes 157 applications in one faculty in five years. And the stop is real: a terminated project at month four releases the remainder, which goes back into the round.
Why it is cheap to try
Because it needs no new money anywhere. Not from the Council, not from the Faculty, not from the Core. It is a sentence added to section 4.3 and a template certificate.
The scheme manager's own question was who signs it and what does it commit them to, which is a drafting question and the right one. A director who certifies a measurement that then fails has her facility's accreditation looking at it, and that is a sharper discipline than anything a funder could impose from outside.
And what I am not doing with my own fund
The twenty-three awards stay at ยฃ8,000 and stay doing the twenty-three things they are good for.
I am not touching the ceiling, because the Dean's office asked me which eleven and the honest answer is that the ceiling was never the fault. The fault was that anybody had to buy a figure in order to be allowed to ask a question.