Books › Promptly
Promptly ยท a novel

Chapter TwoFour Rooms Apart

Chapter 2 of 183 min read653 words

January โ€“ March 2032

The investigation took eleven months and there were three of them and all three are public and Dillard Haygood has read all three about nine times.

The state's. The Georgia Public Service Commission's pipeline safety staff โ€” four inspectors for the state's municipal systems, which is a number that comes back in chapter eight.

Findings: the leak was a crack in a two-inch steel main, installed 1961, unprotected against corrosion on that segment, sixteen feet from the service tee to 411 Cannonball Road. Gas migrated under the pavement and through the sub-base and up through the footing wall into the crawl space and from the crawl space into the kitchen, which is the classic path and is in every pipeline safety textbook printed since about 1970.

The ignition source was undetermined. Probably a water heater.

Compliance findings against the City of Rayburn: two.

One: inadequate documentation of the 2030 survey follow-up, which is a paperwork finding, civil penalty eleven thousand dollars, which the city paid.

Two: failure to follow its own operations and maintenance manual in respect of re-evaluating a Grade 3 leak within fifteen months โ€” which the city had not done, because item nineteen of the 2030 survey was reported in September 2030 and fifteen months is December 2031 and nobody re-evaluated it, and it was on a list.

Civil penalty nineteen thousand dollars.

Total civil penalty for a fatality: thirty thousand dollars.

Thirty thousand dollars, Dillard Haygood wrote. I am not going to make an argument about the size of it because the penalty schedule is the penalty schedule and the inspector who wrote it has four inspectors for the whole state and did exactly what his schedule told him to do. I am putting it in because somebody will otherwise assume it was bigger.

The city's own. Conducted by its insurance pool. Not public, and he has not seen it, and the city manager told him in 2033 that its principal recommendation was the purchase of software.

And the federal one. There was none. A single-fatality distribution incident in a town of six thousand people does not draw a federal investigation and he has never suggested it should.

โ–

What everybody agreed on, including Dillard Haygood:

That the grading schedule is correct. Grade 1, Grade 2, Grade 3 โ€” hazardous now, hazardous in future, non-hazardous โ€” is a sound, old, well-tested framework used by every operator in the country, and the fifteen-month re-evaluation of a Grade 3 is not negligent and is in the industry's own consensus standard and is what everybody does.

That the crew did their job.

That the clerk who took the call did her job.

That the city's three-person gas department cannot be on the street at two in the morning and there is no version of Rayburn, Georgia, in which it can.

And what nobody addressed in any of the three investigations, which is the thing this book is about:

The city had, on the seventeenth of January 2032, two pieces of paper about that block.

A customer odour call at 13:20 on the seventeenth of January 2032.

A leak indication of 2.1 per cent gas in air a hundred and ninety feet away, reported on the eleventh of September 2030.

Those two pieces of paper were in the same building, four rooms apart, in a city hall of eleven employees.

Neither investigation report mentions that both existed. Dillard Haygood has checked all three, page by page, twice.

The call log is a Word file on the front counter machine.

The survey report is a PDF in the gas superintendent's email and a paper copy in a binder on a shelf.

There is nothing in the city's operations and maintenance manual, in the state's regulations, in the federal regulations, or in the industry consensus standard that says those two documents should ever be looked at together.

Not prohibited. Not required. Nothing.

All 18 chapters · Promptly

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.