INTERNAL NOTE โ€” NOT ISSUED (H. MARRICK, AUGUST 2033) Review of 174 connection agreements prior-dated to Calderbeck Battery at the Scarrowโ€“Netheridge boundary, against publicly available information only. No planning application traceable, 3+ years after connection application: 58. No substantive correspondence with the company in 24 months: 26. Land option or lease recorded as lapsed or site sold to an unrelated party: 9. Distinct agreements meeting at least one marker: 71 โ€” totalling 8.6 GW. Status: prepared on own initiative. Not a company position. Not acted upon.

I did this on a Sunday on my own laptop with a public planning portal and Companies House, and it is the single most useful document I have produced in fourteen years, and it has no standing whatsoever.

โ–

What the markers are and are not

They are not proof. I want to be harder on my own analysis than anybody else will be.

No planning application after three years is a strong marker and not a conclusive one. Some projects legitimately sequence consent after grid certainty, particularly where the planning route is a national one. I would guess that is a handful of the fifty-eight. I cannot tell you which.

No correspondence in twenty-four months is weaker than it sounds. A holder with nothing to do has nothing to write about, and my own process does not require them to write.

A lapsed land option is the strongest of the three and the rarest, because it is the one that is close to dispositive: you cannot build a battery on a field you have no rights to. Nine of them. Two had been sold for housing.

Overlap is heavy. Fifty-eight plus twenty-six plus nine is ninety-three, and the distinct count is seventy-one, which tells you that the projects with no planning application are largely the same ones that have gone quiet.

โ–

Eight point six gigawatts

Against a regional peak demand of two point one gigawatts.

I am aware that an enormous queue relative to demand is not in itself evidence of anything โ€” export projects do not serve local demand, and a region can and should host generation far in excess of what it uses. The comparison is not the argument.

The argument is the seventy-one. Eight point six gigawatts of boundary capacity, held by projects I can find no external evidence of, consumed in full in every study I run, generating a seven-hundred-and-forty-million-pound reinforcement requirement for the people behind them.

โ–

Why the note was never issued

Three reasons, in ascending order of how much they bother me.

It is not my job and nobody asked. I would have been presenting an unsolicited analysis of other companies' projects based on information I was not given by them.

It is legally awkward. "I have reviewed your competitors' land options in my own time" is a sentence that ends with a letter from a solicitor, and the company would have been right to be nervous.

And the third: it would have changed nothing, because there is no action it could have triggered. There is no provision in the methodology under which a lapsed land option, or a missing planning application, or two years of silence, does anything at all. The note describes a situation nobody has the power to respond to.

So it sat in a folder called queue on a laptop in Netheridge for three years, and the seventy-one are, as of this morning, seventy-four.