Books › Route Knowledge
Route Knowledge ยท a novel

Chapter FourWhere the Two Hundred and Fourteen Went

Chapter 4 of 183 min read585 words

ENNERLY LOOP โ€” HOW THE REGISTER FELL (R. L. FRAYNE, RECONSTRUCTED FROM THE COMPETENCE RECORD) To April 2028: the loop carried the 23:42 Westmoorโ€“Caldreth, Sundays only, a booked diverted working that existed because the main line's weekend engineering access pattern closed it every Sunday night. Every driver on the Sunday night link worked the loop as ordinary rostered work, four or five times a year. Register: 214. December 2028 timetable change: the engineering access pattern changed. Sunday night possessions moved to a two-weekly cycle on the other line, the main line stayed open, and the 23:42 was re-pathed over the main line. It was 9 minutes quicker that way. Route knowledge consequence considered at the time: none recorded. I have the change file. It is thorough on paths, stock, crew diagrams, connections and costs. The words "route knowledge" do not appear in it. April 2029 register: 178. April 2030: 61. (the first full 26-week cycle with no booked working) The route knowledge was a by-product of a train that ran for a different reason. When the reason stopped, so did the by-product, 26 weeks later, in the record of a department that was not in the room.

Two hundred and fourteen to sixty-one in two years, and no decision anywhere caused it.

โ–

The 23:42

It was not a useful train. It carried perhaps nine people on a good night and it existed because the main line was shut for engineering every Sunday and the service specification required something.

So for about fifteen years, every driver on the Sunday night link signed the loop without anybody intending that they should. They worked it four or five times a year as ordinary booked work, in darkness, in all weathers, and their route knowledge for the diversionary route renewed itself for nothing โ€” no path, no relief, no instructor, no budget line.

It was the cheapest competence the company has ever held and nobody knew they held it.

โ–

The change, which was right

In 2028 the engineering pattern moved. The main line stayed open on Sunday nights. So the 23:42 went back over the main line, where it was nine minutes quicker and used a path that already existed.

I have read the change file three times. It is a good piece of work. Paths, units, crew diagrams, connectional impact, a cost case, a risk register with fourteen entries.

None of those entries is about competence, and I would not have expected one to be, because the change file is a Service Planning document and route knowledge is a Driver Standards matter, and the two departments are on different floors and in different directorates and have no reason to speak about a Sunday night train carrying nine people.

โ–

What it looked like from my desk

Nothing. It looked like nothing at all.

The register is a live document. People lapse off it constantly โ€” retirements, transfers, long-term sick, drivers who move depot. In any given quarter in 2029 the loop column went down by nine or ten names and every single one of those names had an individual explanation that was correct.

I was watching a hundred and seventy-eight individual lapses and not one trend, because the report I produce is by driver and the question is by route, and I have produced that report every month for nine years.

It took until 2035 for me to turn the table the other way round. The data had been mine the whole time.

All 18 chapters · Route Knowledge

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.