Books › Until Further Notice
Until Further Notice ยท a novel

Chapter FifteenA Date Instead of a Phrase

Chapter 15 of 182 min read554 words

WHAT I AM ASKING FOR Every temporary speed restriction imposed on a structure to carry, from the day it is imposed, two fields that it does not carry now: 1. A review date. Not a repair date โ€” a date by which somebody must look again. 2. A running cost. Trains per day ร— minutes lost ร— days in force, updated monthly, in money and in passenger-hours. And one rule: when a restriction passes its review date, it escalates โ€” with the running cost attached โ€” to somebody who can authorise the work. That is all. No new money. No new powers. No change to the safety standard.

I want "until further notice" to become a date.

โ–

What each piece does

The review date does not force a repair. It forces a conversation on a day certain. Six months, say, for a restriction expected to be short; twelve for one awaiting a possession. Reaching it is not a failure; it is a diary entry that fires whether or not anybody remembers the bridge.

Nathan Ogley asked is anything happening with this one in February 2032 and I closed the question with a true answer. A review date would have asked it again in August, and again in February 2033, and it would have asked it of my manager rather than of me.

The running cost does the heavier work. It takes the quantity that currently has no home and gives it a home: on the restriction record, next to the restriction, growing.

If the SEM/142 record had said ยฃ3.8m and rising in November 2031 when I bid to displace Carr Moss, I do not know that I would have won โ€” Carr Moss was a real scheme with real materials on the ground. But I would not have written four words in a free-text box, and Hartnoll would not have had to convert a date into a duration in his own head, and the person deciding would have been comparing two numbers instead of a number and a phrase.

The escalation is the part that costs something, and what it costs is somebody's attention. It means that a restriction which passes twelve months becomes a named item in front of a director, with a figure beside it. It means forty-one items on this route, seventeen of them immediately.

That is an uncomfortable first year. It is also the whole point: those seventeen already exist and already cost what they cost. The only change is that somebody with authority would know.

โ–

Why I think it is small

The data all exists. Train counts are in the timetable. Running-time penalties are calculated to impose the restriction in the first place. The imposition date is on the notice. The delay cost per minute is published quarterly.

Nothing in this requires a measurement that is not already taken. It requires two columns on a form, a date in a diary, and a rule about what happens when the date arrives.

I am aware that every engineer who has ever wanted something has described it as a small change to a form. I have checked this one as honestly as I can, and the honest version is: the fields are small, the escalation is not, and the escalation is the bit that matters.