TSR NOTICE โ WITHDRAWAL SEM/142 Netherfold, Down and Up lines, 142 m 10 ch to 142 m 32 ch. 20 mph temporary speed restriction imposed 6 May 2031 is WITHDRAWN with effect from 04:10, Monday 22 November 2032. Permissible speed 90 mph restored. Structure assessed as capable at line speed following bearing replacement. Duration of restriction: 566 days.
Four lines. The same form as the one that imposed it, with a different word in it.
The first train
The 05:12 from Semerstone took Netherfold at line speed at twenty-four minutes past five on the morning of 22 November 2032, and I was standing on the embankment in the dark to watch it, which is sentimental and I do not apologise for it.
It crossed the restricted length in a shade over ten seconds. For five hundred and sixty-six days that had taken the better part of a minute.
What happened afterwards
The December 2032 timetable change removed the three and a half minutes. The 06:47 went back to 06:47, and the connection at Carr Moss for the 07:58 came back, and as far as I can establish nobody wrote to say thank you, which is correct, because the connection had existed before and had been taken away by us without anybody writing to complain either.
The route's performance figures got very slightly worse in the first period after the timetable change, because a tighter schedule is harder to keep. Somebody had to explain that in a meeting.
Netherfold now generates no delay, appears in no report, and is a structure with two good bearings and a drainage detail that works. It will not be mentioned again.
What I did with the number
I put the eleven point nine million pounds and the forty-two and a half passenger-years in a two-page note and sent it up in September 2033, with the forty-one restrictions behind it and the review-date-and-running-cost proposal at the end.
The reply thanked me, called it interesting, and said it would be considered as part of the next review of the structures management standard, which is scheduled for 2035.
I have read that reply perhaps thirty times looking for something to be angry about, and there is nothing. It is a reasonable response to an unsolicited note from a route engineer about a national standard. Nobody is ignoring me. It is in a queue โ which is, I am aware, the exact shape of the thing I am complaining about, and I notice that, and I do not know what to do with it.
The last thing
I keep the old bearing in my office. The chalk mark is still on the housing.
People ask what it is, and I tell them it is a bridge bearing, and if they ask anything else I tell them that it cost eleven point nine million pounds and forty-two years of people's lives to leave it in place, and that nobody did anything wrong, and that this is the part they should find frightening.
Because if somebody had been negligent at Netherfold there would be a lesson that consisted of finding that person. There was no such person. There was a brake that was free and a repair that was not, a form that asked for a date instead of a duration, and a phrase on a notice that meant nobody had to say when.
Until further notice. It was five hundred and sixty-six days. Somebody should have had to write that down at the start.