INCIDENT โ 19 April 2033, 08:06 Train 1F09, 100 mph, down line. Fatality at Mossbank No. 2. Deceased: Ronald Mapstone, 73, of Mossbank Lane. A dog, uninjured, recovered from the field side. Driver: applied emergency brake on sighting; stopping distance exceeded; no fault. Line reopened 16:40.
Ronald Mapstone had lived on Mossbank Lane since 1991 and used that crossing twice a day.
He is one of the thirty-six dog walkers in my 2027 census. I do not know whether he is one of the thirty-one who did not stop, and I have never wanted to work out whether he could be identified from my notes, and I could, and I have not.
What the investigation found
Nothing that was not in my 2027 assessment.
Sighting nine seconds west, five point six east. Crossing time seven seconds. Line speed 100 mph. No mechanical defect, no signalling irregularity, no driver error, no obstruction of the sighting line beyond what the 2030 vegetation clearance had left. The crossing was in the condition the railway maintained it in and that condition complied with every applicable standard.
The report records that an extinguishment order was applied for in 2029 and refused in 2031, and that a bridge had been assessed and not funded. It sets both out factually, in two paragraphs, without criticism of anybody, and it is right not to criticise, because nobody did anything wrong.
Its recommendation is that the railway should pursue closure, with grade separation if necessary.
Which is Option 1 from 5 July 2028.
The morning
I was at a crossing forty miles away when the control call came, and I was on site at Mossbank at ten past eleven.
The line had been stopped since six minutes past eight. There is a protocol for these and everybody on site knew it; the British Transport Police had the scene, the driver had been relieved and taken away, and my job that morning was to stand at the stile with a colleague and record the physical condition of the crossing: gates, decking, signage, sighting, vegetation.
We photographed everything. The sighting was 250 metres east, as it had been since the 2030 clearance. The gates worked. The signs were legible and correct. The anti-trespass panels were sound. Every item on the inspection sheet was compliant and I wrote satisfactory nineteen times down a page while two hundred yards away a tent had been put up.
That sheet is in the investigation file. It is an accurate record of a crossing in good order.
The inquest
I gave evidence for an hour and ten minutes in June 2034.
I was asked whether the railway knew the crossing was dangerous. I said yes, and gave the ranking: third of four hundred and twelve on individual risk.
I was asked why a bridge had not been built. I explained the appraisal and the benchmark and the two point nine million pounds per fatality-weighted injury averted.
The coroner asked me one further question, which was whether, if the crossing had been used by nine hundred people a day instead of fourteen, the bridge would have been built. I said yes. He asked me to explain why. I did, and it took about four minutes, and it is Chapter Seven, and it is correct, and I could hear how it sounded in that room.
His conclusion was accidental death. His prevention of future deaths report, issued in September 2034, is three pages and recommends that where an order to close a crossing is refused, the residual risk should be formally recorded and reviewed โ which is very nearly what I have ended up asking for, and which I did not know about until I read it, and which was the first time I had seen the thing I had been unable to say.