Books › Extinguishment
Extinguishment ยท a novel

Chapter FourteenZero Objections

Chapter 14 of 183 min read616 words

SECOND APPLICATION โ€” 6 March 2034. Objections closed 1 June 2034: NONE. Grounds: as 2029, with the addition of the fatality of 19 April 2033 and the investigation report. Alternative route offered: footbridge on the line of the path, funded, with the order conditional on its provision. Order confirmed without inquiry, 13 February 2035. Bridge opened 24 September 2036.

Zero objections, and the same path, and the same people.

โ–

What changed

Two things, and neither of them was the crossing.

The railway offered a bridge. One point four million pounds, in the funded programme, approved in October 2033 โ€” six months after the fatality and five years after the appraisal said it was poor value.

The appraisal number did not change. Nobody recalculated anything; the cost per fatality-weighted injury averted at Mossbank No. 2 is still about two point nine million pounds, because the metric is forward-looking and a death that has already happened does not prevent a future one. The scheme was approved outside the prioritisation framework, by a decision at a level above mine, on grounds that were not written down in any document I have seen.

And the objectors withdrew. The parish council wrote one sentence saying it would not oppose. The ramblers did not respond at all. The three residents of Mossbank Lane โ€” Ronald Mapstone's neighbours, two of whom had objected in 2029 โ€” said nothing.

โ–

What I was asked to write

In November 2033 I was asked to produce a short paper for the route director setting out the case for funding the bridge.

It is two pages. It contains the 2027 sighting figures, the 2027 individual risk ranking, the 2028 appraisal, the 2029 application, the 2031 refusal, the 2032 near miss and the 2033 fatality.

Every figure in it except the last two was available in July 2028, when the bridge was rejected.

I wrote it in about forty minutes, because there was nothing to research. It was approved in under three weeks.

I have kept a copy, and the thing I notice whenever I look at it is that it is not an argument. It is a chronology. Somebody senior read a list of dates and approved one point four million pounds, and the list of dates would have read almost identically in 2031 with two fewer lines on the end.

โ–

What that sequence means

The order that could not be obtained in 2031 was obtained in 2035, on the same path, for the same reason, with a better alternative.

The better alternative was available in 2028 and cost one point four million pounds.

So the thing that unlocked it was not new evidence about risk โ€” every number was in my 2027 assessment โ€” and not a change in the law, and not a change in anybody's view of the sighting time. It was a death, which changed what an organisation was willing to spend and what a community was willing to oppose.

I want to be careful about how that is read. The parish council did not withdraw because they had been proved wrong; they withdrew because a man they knew had been killed and because the railway was now offering a bridge, which is what they had asked for in 2029. They were consistent throughout. It is the railway that moved.

โ–

What it cost to move it

Between the first application and the confirmed order: five years, eleven months.

Between the appraisal that rejected the bridge and the approval of the same bridge: five years, three months.

Between the inspector's observation that a bridge would resolve the matter and the decision to provide one: two years, eight months, and a fatality.

All 18 chapters · Extinguishment

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.