SUBMISSION TO THE LEVEL CROSSING POLICY REVIEW โ 5 November 2036 From: S. Rennick, Level Crossing Manager. That where an application to extinguish or divert a public right of way at a level crossing is refused or withdrawn, the duty holder be required to record, in a published register entry for that crossing: (a) the individual risk rank of the crossing within its route at the date of the decision; (b) the sighting time and crossing time; (c) the option appraised and the reason it was not provided. That the entry be reviewed and republished annually until the crossing is closed, grade-separated or re-ranked. No change is proposed to the order process, the objection rights, the inspector's test, or the prioritisation metric. The proposal is that a refusal state what it leaves in place.
A refusal currently records why the order was not made. It records nothing about what remains.
This asks that the thing left behind be written down, by the party that knows the figure, and kept written down until something changes.
Why the duty holder and not the inspector
My first draft asked for it in the inspector's decision, and the coroner's report had suggested something similar. I moved it after talking to a planning inspector, who pointed out two things.
An inspector decides the application in front of him on the evidence before him. Requiring him to publish a risk ranking means requiring him to adopt and endorse the applicant's own model output, which he has not tested and which the objectors may not have challenged. That is a real objection and I could not answer it.
And an inspector's decision is a document about one moment. The register entry I want is a thing that has to be renewed annually, which an inspector cannot do and a duty holder can.
So: the railway writes it, the railway publishes it, the railway keeps it current, and the railway is the one embarrassed by it, which is the right distribution.
What it would have looked like at Mossbank
Mossbank No. 2. Extinguishment order refused 24 February 2031. Individual risk rank at date of refusal: 3 of 412. Sighting 9 s (west), 5.6 s (east); crossing time 7 s. Footbridge appraised at ยฃ1.4m, cost per FWI averted ยฃ2.9m against a route benchmark of ยฃ1.2m; not provided.
Four lines. Republished in 2032, and 2033.
Every figure in it existed on the day. Not one of them was published anywhere.
The objections
It is an admission of liability. The strongest objection and the one that will decide this. A published statement that the railway knows a crossing is third-worst and has not fixed it is a document that will appear in a claim. My answer is that the ranking already exists, is disclosable, and was read out at an inquest; publishing it changes who learns it first, not whether it is known.
It will be read as a league table of death. It will. Local papers will publish the top ten for their region, which will be accurate and will cause alarm at crossings where nothing can be done.
It may deter applications. The one that worries me. If refusal triggers a published entry, a duty holder has a reason not to apply for an order it might lose. I have proposed the entry apply to withdrawn applications too, which closes part of it and not all.
It changes nothing about the money. Correct. Chapter Sixteen.
Reference LC/2036/044.