Books › In Perpetuity
In Perpetuity ยท a novel

Chapter TwelveThe Benchmark

Chapter 12 of 183 min read597 words

HEAT NETWORKS REGULATION โ€” CONSUMER PROTECTION, CONSULTATION OUTCOME 2032 (extract) The Authority will have power to intervene where heat network prices are disproportionate compared with prices for comparable heating systems, or significantly higher than a benchmark derived from regulated gas tariffs. Where a price is found disproportionate, the Authority may require the operator to reduce it and may require redress to consumers. The Authority recognises that some schemes operate at low load factors for reasons outside the operator's control and will consider the circumstances of the individual scheme. Guidance on such cases will follow.

A power to make me reduce a charge I am already not fully making, with a benchmark that is the gas price, and guidance to follow. I welcomed it publicly and I have been afraid of it since the day it was published.

โ–

Why it is the right power

Because the previous position was that a captive consumer had no price protection at all, and that was indefensible. There are schemes in this country with no fourteen-hundred-and-twenty excuse: schemes where the load is fine, the plant is adequate, and the charge is high because the owner has worked out that nobody can leave. Those schemes exist, I have seen two of them, and the power exists for them.

I am not going to argue against a price protection for captive consumers because it is awkward for the scheme I run. Thornmere Riverside is the hard case, and hard cases are a reason for careful guidance, not a reason to leave everybody unprotected.

โ–

Why it does not work here

Apply the benchmark as drafted. A charge of ยฃ2,248 against a gas comparator of ยฃ663 is disproportionate by any reading; the ratio is nearly three and a half to one and no amount of explaining the denominator changes the arithmetic the consumer faces.

So the Authority directs that the total annual charge be reduced to, say, ยฃ900 a dwelling โ€” generous against the comparator. Revenue falls by about five hundred and fifty thousand pounds a year. The loss goes from eight hundred and forty thousand to roughly one million four hundred thousand, against a parent that has already said it will fund nothing beyond March 2034.

The company does not reduce the charge and absorb it. The company goes into administration, and the asset is sold to a buyer with no parent, no shareholders to embarrass and nothing to lose, and then somebody has to work out who keeps four hundred and twelve flats warm in January.

That is not a threat; it is a cash flow. I have put it to the Authority's officials twice, in writing, and both times received a courteous reply noting that the circumstances of individual schemes will be considered.

โ–

The guidance that will follow

It has not followed. It was promised in 2032 and the latest indication is 2035.

I understand why. Writing guidance for low-load-factor schemes means deciding, in effect, who pays for stranded capacity on a network built to a consent that was not delivered โ€” and that is not a tariff question, it is a question about who bears the cost of a planning system's assumptions. A regulator asked to answer it with price-control powers is being asked to make a fiscal decision with a tool for making price decisions.

So the guidance is hard because the underlying question has never been assigned to anybody, which is what I have been saying since Chapter Three, and which is why my ask in Chapter Fifteen is not addressed to the regulator at all.

All 18 chapters · In Perpetuity

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.