
Six parties each answer 'this is not mine' and each is correct - so a GBP 10.2m shortfall lands, with nobody choosing it, on the four hundred and twelve households who may not leave.
A borough requires a site-wide heat network by planning condition, to secure a 37% carbon reduction on a consented riverside scheme of 1,420 homes. The condition is right: one energy centre beats 1,420 gas boilers, and the lease covenant compelling connection in perpetuity is not an abuse but the structural condition for the thing being financed at all. The energy centre, the 8.9 MW of plant and the 1,900 m of buried mains are built once, for the whole scheme, because that is the correct engineering decision.
Phases 1 and 2 are built - 412 dwellings, a school and a leisure centre. The developer goes into administration in 2024; phase 3 is sold and never started; phase 4's land is sold and its consent lapses. The network serves 29% of the homes and carries 100% of the GBP 1.31m fixed cost. GBP 1,310,000 over 412 dwellings is GBP 3,126 each before anybody turns a radiator on. The tariff manager charges GBP 1,140 instead and the parent company absorbs GBP 840,000 a year - until November 2032, when it gives notice that it will not.
Every protection assumes a market. There is no price cap, no supplier of last resort, no licence, and nobody to switch to, because the account is a pipe. The council says it is a contractual matter; the company says it is cost recovery; the Ombudsman says it is outside remit - and all three are right, and the sum of three correct answers is that there is no forum in which the question can be asked. A residents' association of 318 households writes to ask not about the arithmetic, which it accepts, but who decided.
The narrator writes to the council asking not to be released from anything, only whether any mechanism exists by which the consequence of non-completion can be considered by anybody. The reply is accurate: there is none. New price-protection powers, benchmarked against gas, would move the scheme into insolvency rather than lower its cost. She asks for one thing: that a consent record the connection count its economics assume, that a material shortfall trigger a recorded review, and that the authority be required to choose from a closed list and say which - including 'do nothing, and say so, with reasons, published'. She refuses striking out the covenant, capping the price with no funder named, and making councils liable for outturn. A work of fiction: the borough, the scheme, the companies and every person in them are invented.
10,755 of 10,869 words ยท 99%
ยฉ 2026 Lazarus Jackson. All rights reserved. This is a work of fiction. All characters, companies, institutions and events are invented; any resemblance to real people or organisations is coincidental.