Books › In Perpetuity
In Perpetuity ยท a novel

Chapter FifteenA Closed List and a Signature

Chapter 15 of 183 min read587 words

WHAT I AM ASKING FOR 1. That where a planning condition compels connection to a network in perpetuity, the consent records the connection count the scheme's economics assume โ€” a single number, taken from the applicant's own Energy Statement. 2. That where connections fall below a stated proportion of it โ€” I would say 70% โ€” and the remaining phases are not reasonably expected to be delivered, the consenting authority must hold a recorded review within 90 days. 3. That at the review the authority must choose from a closed list and record which it chose: (a) fund the shortfall; (b) release the connection obligation and accept the consequences; (c) seek a transfer of the asset; or (d) do nothing, and say so, with reasons, published. No new liability. No new money. No new power to compel anybody.

I am asking that somebody be made to choose from four options, one of which is to do nothing.

โ–

Why the number first

Because the number is the whole omission. Fourteen hundred and twenty is in the Energy Statement, the design basis, the loan, the carbon calculation and the cash flow, and it is in no document that binds anybody.

Writing it into the consent costs one line and creates no obligation. It simply means that the figure the entire arrangement stands on exists somewhere it can be checked against reality, by anybody, at any time, without a consultant.

At present you cannot even state the problem at Thornmere Riverside without obtaining a 2019 Energy Statement from a planning portal and reading page 34. Pauline Askrigg did exactly that, unaided, and should not have had to.

โ–

Why option (d) is in the list, and why it is the most important one

Everybody who hears this proposal asks why I would include do nothing when do nothing is what happens now.

Because what happens now is not do nothing. What happens now is that nobody chooses, which is different, and much worse.

A council that reviews Thornmere Riverside in 2027, considers four options, and publishes a decision that it will do nothing because it has no funding, has told four hundred and twelve households the truth: that their position has been considered by a named body which has decided not to act. Pauline Askrigg's letter asked who decided. That document would answer her.

It would also, and this is the part I care about most, exist โ€” as a public record, in a planning file, with a number in it, available to the next officer drafting the next condition 23 and to the next member deciding whether to impose one. A line of published decisions saying we built capacity for fourteen hundred and twenty, four hundred and twelve were delivered, and we did nothing would change how the next one is drafted within five years, without a single new power.

โ–

Why I think it is small

It asks for no money, imposes no liability, creates no cause of action and transfers no risk. The number comes from the applicant. The trigger is arithmetic. The review is a meeting. Three of the four options are available to an authority today and the fourth is to decline, in writing.

The expensive part is not the review. It is having to put a name to the answer, and I accept that is exactly why it would be resisted, and I would rather ask for a signature than for ten point two million pounds I know does not exist.

All 18 chapters · In Perpetuity

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.