WHAT A COMPLETION DATE IS (R. TIPLADY, 2035) The decision to build in a flood plain is taken by: the landowner (to promote the site), the developer (to buy it), and the planning authority (to permit it). All three decisions are complete at the grant of permission. The completion date of a plot is determined by: phasing, the discharge of pre-commencement conditions, utilities adoption, ground conditions, weather, the housing market, materials and labour supply, and which plot in the phase it happened to be. On Rill Meadow, plot completions ran June 2010 to November 2012 under one permission. The cut-off is 1 January 2009. Every plot is excluded; the permission predates the cut-off by seven weeks. Nobody chooses a completion date as an act of policy. It is an output of a construction programme.
That is the whole of it. The rule is attached to the one date in the process that nobody decides.
Why the date was chosen as it was
Not carelessly. A construction date is knowable, verifiable and cheap โ it is on the warranty, the Land Registry entry and the council tax record, and an insurer can look it up in a second for any of ninety-six thousand properties.
A planning permission date is none of those things from where I sit. It is in a local register, under a reference nobody holds against the address, and it took a contractor three weeks and fourteen authorities to get it for nine thousand properties.
So the Scheme chose the date it could actually administer, which is the correct engineering decision and the wrong policy decision, and I do not think anybody weighed the two against each other because the question was never put that way.
The seven weeks
Rill Meadow was permitted on 11 November 2008. The cut-off is 1 January 2009.
Seven weeks. If that permission had been determined in February rather than November โ and planning committees slip by months routinely โ every house on the estate would be inside the pool, and Kehinde Afolabi's renewal would be three hundred and seventy-two pounds.
The difference between a three-hundred-and-seventy-two-pound premium and a four-thousand-one-hundred-and-eighty-pound premium, for his family, is the date a committee happened to sit.
And the deterrent cannot reach backwards
Here is the sharpest version and I have checked it twice.
The Scheme did not exist in 2008. The levy did not exist, the pool did not exist, the eligibility rules did not exist, and the 1 January 2009 cut-off was written years afterwards.
So for the three thousand three hundred and eighty houses in Chapter Eleven permitted before the cut-off, the deterrent is being applied to a decision taken before the deterrent was invented. There is no mechanism by which it could have altered their behaviour. It is not deterring; it is charging.
A rule that is purely prospective in its justification and partly retrospective in its application is not doing the job it is defended on.
What the rule does do, and does well
For a permission granted in, say, 2019 โ after the Scheme, with the cut-off known, with every professional in the chain able to see it โ the exclusion is a genuine, prospective, well-aimed deterrent, and the developer promoting that site knows exactly what it means.
That is the case the rule was written for and in that case I would not change a comma. My proposal leaves it completely intact, and Chapter Fifteen is only about which date the test reads.