CANDIDATE TRIGGER DATES (R. TIPLADY, 2035 โ tested against our 9,100) 1. Completion (current). Administrable: yes, trivially. Attaches to a decision: no. Excluded: 9,100. 2. Grant of planning permission. Administrable: harder โ a register lookup. Attaches to a decision: yes, exactly. Would exclude: 5,720. Would newly include: 3,380. 3. Commencement of development. Administrable: yes (building control). Attaches to a decision: partly โ commencement is a commercial timing choice. Would exclude: 6,940. 4. Date of first sale. Administrable: yes (Land Registry). Attaches to a decision: no โ and it would make the rule depend on how fast a developer sold. 5. Both: excluded only where permission AND completion are after the cut-off. Would exclude: 5,720 โ identical to (2) in this sample, because no plot here was permitted after the cut-off and completed before it.
Five candidates. Two of them attach to a decision somebody actually took.
Why not commencement
It is tempting, because building control holds it and it is as cheap to look up as completion.
But commencement is a commercial timing choice. A developer can implement a permission with a trench and leave the site for two years, and routinely does, to keep a permission alive. Attaching the rule to commencement would make it depend on a legal manoeuvre, which is exactly the sort of thing a rule should not reward.
It would also move three thousand three hundred and eighty houses to about two thousand one hundred and sixty โ better than today and worse than the permission date, for no gain in principle.
Why not first sale
Because it makes the eligibility of a house depend on how quickly the developer sold it, which is the one variable the developer controls most directly and the buyer controls not at all.
A slow-selling scheme in 2008 would be penalised and a fast one rewarded. It is the current fault with a different name.
Why option 5 is the honest form of option 2
Option 2 on its own has a gap: a site permitted in 2007 and completed in 2024 would become eligible, and sixteen years is long enough that the developer was making a fresh decision when they finally built.
Requiring both dates to be before the cut-off closes that, and in our sample it makes no difference at all โ every plot permitted before 1 January 2009 was completed within four years โ so it costs nothing and removes the obvious objection.
That is what I am going to ask for.
What it costs to administer
This is the real obstacle and I am not going to minimise it.
Today an insurer runs an address against a construction date it already holds. Under my proposal, for the subset where construction is post-2009, it must also establish whether permission predates the cut-off โ and that is a planning register lookup that does not exist as a national dataset.
Our contractor did nine thousand one hundred properties in three weeks across fourteen authorities. At scale that is a data problem, not a conceptual one: the permission reference is on the local register, the authorities are statutorily obliged to maintain it, and the Planning Inspectorate already aggregates decisions.
I would put the cost at a few hundred thousand pounds to build once, nationally, and almost nothing to run. Against three thousand three hundred and eighty households on my book alone, each facing a mean premium of three thousand eight hundred and seventy pounds the day they claim.