ROLE DESCRIPTION โ COUNTY ARCHAEOLOGICAL ADVISOR (extract) To advise the Local Planning Authority on the archaeological implications of development proposals; to maintain the Historic Environment Record; to specify, and monitor compliance with, programmes of archaeological work secured by condition; to advise on the discharge of such conditions. 1.0 FTE. The post advises on all applications in the administrative county.
One person for the county. That was two posts in 2010 and one and a half in 2016, and the HER assistant went in 2021.
What the year looks like
Eighteen hundred and forty applications screened. Most take ninety seconds: a conservatory, a change of use, a site I know has been quarried.
Two hundred and twelve attract an archaeological condition. Of those, most are discharged by a watching brief or a small evaluation that finds nothing, which is the correct and commonest outcome and is not a failure โ a negative result on a greenfield site is information, and it is the only mechanism that tells us where the archaeology is not.
Thirty-one a year proceed to excavation.
Four reach full analysis and publication.
Where the leverage is, and when it goes
The condition is the whole of my power, and it is front-loaded by design.
Before permission, I can require almost anything proportionate: evaluation, excavation, a specified standard, a named level of analysis. The developer needs the permission and the permission needs the condition discharged, so everything I ask for in that window happens.
Once the archaeologists are off the site and the groundworks start, I have nothing. The ground is gone. There is no sanction available that restores it and no reason for anybody to spend further money, because the thing the money was protecting no longer exists.
So my leverage is at its maximum at the exact moment when nobody โ including me โ can know what will be found, and it is at zero from the moment the discovery has been made and the bill for examining it properly can finally be calculated.
The sequence is the problem and it is not reversible. You cannot cost the analysis of a site before you have dug it, and you cannot compel the analysis after you have let the site go.
Why I am writing this
Because the county is consulting on its planning guidance in the spring, and because of one timber platform, and because of a rented unit in Padgate with two thousand one hundred and forty boxes in it that nobody will take and that the council is paying ยฃ9,400 a year to store.