NATIONAL POLICY (as I quote it in every brief) "Where a proposed development will lead to substantial harm to or total loss of significance of a designated heritage asset, permission should be refused unless... Where a development proposal will lead to less than substantial harm, this harm should be weighed against the public benefits. Where loss of significance to any heritage asset is permitted, the local planning authority should require the developer to record and advance understanding of the significance of any heritage assets to be lost, in a manner proportionate to their importance and the impact, and to make this evidence publicly accessible."

Record and advance understanding. Two verbs, and the second is the one that fails.

Recording is the dig. Advancing understanding is the analysis, the specialist work, the synthesis, the publication โ€” the part where a hundred and forty boxes of waterlogged timber becomes a sentence about how people in the Middle Bronze Age crossed wet ground.

Both are in the policy. Only the first is enforceable by condition in practice, for the reason in Chapter Two.

โ–

Preservation in situ, which is preferred

The hierarchy is explicit and everybody in my profession can recite it: avoid harm first, mitigate second, record last. Preservation in situ is the preferred outcome for remains of any significance.

In fourteen years I have secured preservation in situ nine times.

It is not that planning officers ignore the hierarchy. It is that preserving in situ means not building on that part of the site, which means a redesign, which means a developer must accept a smaller scheme for a reason that produces no visible object. Where the remains are nationally important, that argument wins, and it should. At Barrow Heys the remains were not known to be nationally important until they had been dug, which is the circularity at the centre of this.

A buried site is evaluated by trenching perhaps three to five per cent of its area. The timber platform at Barrow Heys fell between two evaluation trenches eighteen metres apart. Had a trench clipped it in February 2030, I would have had a case for in situ preservation and a developer with a decision to make.

It did not. So the platform was found in June, with permission granted, groundworks programmed, and the scheme's finance committed โ€” the one moment at which preservation in situ is no longer a planning decision but a demand to stop a construction site.

โ–

What I did about it

I asked. Formally, in writing, on 1 July 2030, for the platform area to be excluded from development and preserved in situ under a management agreement.

It was refused in six days, politely, with a reasoned letter from the developer's agent explaining that the platform sat beneath the central service corridor, that relocating it required redesigning three units and the drainage strategy, that the scheme's funding was conditional on a completion date, and that they would instead fund a fuller excavation.

That was a reasonable answer and I accepted it. I did not have the power to insist and I would have lost an appeal, because the planning balance had already been struck in September 2029, on the information available in September 2029, which did not include a timber platform nobody knew was there.