MY BRIEF, 25 June 2029 (extract) The applicant shall commission a programme comprising: (i) trial trench evaluation at 3% sample; (ii) subject to results, open-area excavation of affected areas; (iii) post-excavation assessment; (iv) analysis, publication and archive deposition to the standards set out in the relevant guidance, the scope to be agreed following assessment.
WRITTEN SCHEME OF INVESTIGATION, approved 9 April 2030 (Vanbrugh Archaeology Ltd) Sections 1โ7: methodology, staffing, timetable, health and safety, monitoring, finds strategy, environmental sampling strategy. Section 8, Post-excavation: "An assessment will be prepared. The scope of any subsequent analysis and publication will be determined following assessment and will be the subject of a separate agreement with the client."
Read section 8 against my paragraph (iv).
My brief says analysis and publication shall happen, scope to be agreed. The approved scheme says the scope of any analysis will be the subject of a separate agreement with the client.
Those two sentences look compatible and are not. Mine treats the analysis as part of the programme with the detail to be settled. Theirs treats it as a future contract that may or may not be entered into.
I approved that WSI. I read section 8, I knew exactly what it meant, and I approved it, and the reason is Chapter Six.
Why the scope cannot be fixed in advance
Because nobody knows what is there.
If I specify analysis in the brief at a fixed scope, I am specifying it blind. On a site that turns out to be empty, I have required a developer to pay for the analysis of nothing โ which is indefensible, gets overturned on appeal, and makes every condition I write less credible. On a site that turns out to be Barrow Heys, whatever number I invented in 2029 is far too small.
So the profession settled, sensibly, on a two-stage structure: dig, assess what you have, then agree analysis proportionate to it. Every guidance document recommends it. It is the only method that fits the work.
Its weakness is the one in Chapter Two. The assessment that tells you what the analysis should cost arrives after the site has been destroyed, which is after the only moment at which the authority had anything to withhold.
The phrase that does the damage
The subject of a separate agreement with the client.
Every WSI I receive contains a version of it. I have tried striking it out twice. On the first occasion the contractor explained, reasonably, that they could not contract to deliver unspecified work at an unspecified price. On the second the developer's agent asked me which part of the planning condition required a contractor to commit to an open-ended liability, and the answer is none of it.
They were both right, and the sentence stays in, and it is the hinge on which thirty-one excavations a year become four publications.