CORRESPONDENCE โ H. MARRICK TO APPLICANT, 3 FEBRUARY 2032 (extract) "...before issuing the revised offer, it would assist our planning if you could confirm whether the site remains under option to your company and whether a planning application is presently intended." REPLY FROM APPLICANT'S SOLICITOR, 11 FEBRUARY 2032 (extract) "Our client is not obliged to provide the information requested and declines to do so. We note that the Methodology expressly prohibits differentiation between applicants on the basis of perceived deliverability, and we would be grateful for confirmation that our client's queue position is not under review." COMPANY RESPONSE, 13 FEBRUARY 2032 "Confirmed. The enquiry was not a review of queue position and no inference should be drawn."
That was the one time I asked. It took eight days to find out that I was not allowed to, and the solicitor was right.
What I actually asked
Read it again. I did not demand proof. I did not threaten the position. I asked, politely, in a sentence beginning it would assist our planning, whether a site was still under option.
I asked because the planning portal had shown the site sold eighteen months earlier, and because this holder sat at a boundary where their 240 MW was the single largest contributor to the reinforcement trigger, and because every study I ran for every applicant behind them assumed that 240 MW was coming.
Why the solicitor was right
Because an enquiry from a monopoly network about the deliverability of a project is not a neutral question, and both of us knew it.
If I may ask, I may form a view. If I may form a view, the view will inform something โ if not the queue, then the advice I give, the studies I prioritise, the tone of my correspondence. Applicants have no way of knowing where my view stops. The prohibition on differentiating on perceived deliverability is not just a rule about outcomes; it has to be a rule about enquiries, or it is not a rule at all.
A protection that only engages after harm has been done is not a protection. The reason I may not ask is the same reason I may not decide, and I have come to think the drafting is right.
What my own company did
They answered within two days, confirmed no inference should be drawn, and were entirely correct to.
My director called me and was decent about it. He said he understood why I had asked, that the answer had to be the one it was, and that if I wanted this to change I should write it up and send it to the regulator rather than probing applicants one at a time. He was right about that too, and it took me another eighteen months to do it.
The 240 MW
Still in the queue. Still assumed energised in every study. The site is a housing development with, at the last count, sixty-two homes occupied.
I know that. I have known it since 2031. I may not use it. Somebody behind that agreement is this month being quoted a reinforcement cost and a date which are, in part, a consequence of a 240 MW solar farm that is now a cul-de-sac called Fernlow Rise.
And the thing I have to keep saying, because it is the whole point and it is the thing nobody believes: nobody did anything wrong. The holder is not obliged to tell me. My company is not obliged to ask. The methodology forbids me from inferring. Each of those is a defensible position held for a good reason, and together they produce a 400 kV circuit.