TRANSMISSION REINFORCEMENT — SCARROW–NETHERIDGE 400 kV Scope: new 400 kV double circuit, 38 km, Scarrow substation to Netheridge substation, with associated substation extensions. Estimated cost: £740m. Driver: boundary transfer capability at Scarrow–Netheridge, driven by contracted generation and storage. Consenting route: development consent order. Application programmed 2035; examination and decision 2036–38; construction 2038–42. Programmed energisation: September 2042. Owner: transmission licensee. Not within the control of the distribution licensee.

Seven hundred and forty million pounds and thirty-eight kilometres of overhead line, the date of which sets the date of every application behind it, and which belongs to a company I do not work for.

❖

Why it takes twelve years

Not because anybody is slow. Because a 400 kV double circuit across thirty-eight kilometres of inhabited country requires a development consent order, and a development consent order requires an application supported by an environmental statement, which requires surveys across multiple seasons, which requires a route, which requires consultation, which requires a design.

The examination alone is six months of statutory process, and the decision follows. People along that route have an absolute right to be heard, and exercising it takes time, and the time it takes is not waste.

I would not shorten any stage of it, and I want that on the record before I say anything else. The consenting regime for overhead lines exists because the alternative was a nationalised industry putting pylons wherever it chose, and I am not going to argue for that in order to connect a battery.

❖

What drives it

Read the driver line in the extract again: contracted generation and storage.

Not generation. Not forecast generation. Contracted generation — the sum of signed connection agreements at that boundary, which is the only quantity anybody can act on, because it is the only quantity that is a fact rather than a forecast.

So the business case for a seven-hundred-and-forty-million-pound circuit is built on the same register that contains the seventy-one, and it has to be. You cannot build transmission on the basis of a network company's private opinion about which of its customers are serious. The contracted position is the only auditable input, which is why it is used, which is why eight point six gigawatts of agreements I cannot verify are helping to justify a circuit across thirty-eight kilometres of Lancashire.

❖

The part I find hardest

The circuit is probably needed anyway.

I have run it both ways. Strip out my seventy-one entirely and the boundary still needs reinforcement before about 2038, because the real projects alone exceed the capability. The circuit is not a phantom; it is a real requirement with an inflated and inarguable justification attached to it.

Which means the honest version of my complaint is narrower than I would like, and I am going to state the narrow version rather than the satisfying one. The queue did not cause the circuit. The queue caused the circuit to be the thing that Calderbeck depends on — because a project needing no reinforcement at all was studied against a background in which the capacity was gone, and was therefore handed a 2042 date belonging to somebody else's infrastructure.

❖

Scale

My region's entire distribution network investment over the next price control is a little over four hundred million pounds.

The circuit that sets Calderbeck's date costs nearly twice that, is not mine, and is justified in part by agreements for which I can find, from the outside, no evidence of a project at all.