CONNECTION REGISTER โ€” REGIONAL SUMMARY, 1 SEPTEMBER 2033 Connection agreements in force (generation and storage, >1 MW): 264. Total contracted capacity: 38.2 GW. Regional peak demand: 2.1 GW. Existing connected generation: 1.4 GW. Agreements with a connection date in the current price control: 31. In 2034โ€“38: 86. In 2039 or later: 147. Agreements energised in the twelve months to 1 September 2033: 9. Applications received in the twelve months to 1 September 2033: 112.

Nine energised. A hundred and twelve applied. That ratio is the whole state of the system in two numbers, and it has been getting worse every year I have done this job.

โ–

What the thirty-eight gigawatts is not

It is not thirty-eight gigawatts of projects. I have said this to journalists and it never survives into print.

It contains the same site applied for twice at different capacities, because an applicant who is unsure whether they will build 30 MW or 50 MW is sensible to hold both. It contains projects that are genuinely deliverable and will connect. It contains speculation. It contains, somewhere, a 240 MW solar farm that is sixty-two houses.

Nobody knows the proportions. Not the regulator, not the system operator, not me. Anybody who gives you a confident figure for how much of the queue is speculative is guessing, and I include my own seventy-one in that, which is a lower bound derived from public records and nothing else.

โ–

What I can say with confidence

That the queue grew by one hundred and twelve applications and shrank by nine energisations.

That a 49.9 MW application at a brownfield site next to a spare bay received a date twelve years and four months out.

That in fourteen years I have never once terminated an agreement for a project that did not exist, and I have never had the power to.

โ–

The nine

I want to name what energised, because it is the hopeful part and because it tells you what gets through.

A 12 MW solar farm with no reinforcement requirement at all. Two embedded generators at industrial sites. A 4 MW hydro scheme that has been waiting since 2019 and whose developer has, remarkably, never missed a milestone. Three battery projects at points on my network where there was simply spare headroom. A wind extension. And a 20 MW battery whose developer bought a company in order to acquire its queue position, which is entirely legitimate and cost them, I understand, a very great deal more than fourteen thousand pounds.

Eight of those nine got through by needing nothing from the network. The ninth got through by buying its way up a queue that cannot be reordered by me and can be reordered by anybody with a chequebook.

โ–

The sentence I keep coming back to

A colleague at another network put it to me at a conference in 2032, and it is better than anything I have written.

He said: "The queue is the only honest thing we have, and it's also the reason nothing gets built. I don't know what to do with that and neither does anyone else in this room."

He was right about the first half. I think I know what to do with it now, and it is small, and it is Chapter Fifteen.