Books › Route Knowledge
Route Knowledge ยท a novel

Chapter FifteenOne Booked Working a Week

Chapter 15 of 183 min read619 words

PROPOSAL (R. L. FRAYNE, DRIVER STANDARDS MANAGER โ€” MARCH 2035) 1. Where a route is designated as a diversionary route, the timetable shall contain at least one booked working over it each week. Not an additional train: an existing service, re-pathed. 2. The booked turn rotates between links, so that over each 26-week period the working is taken by 26 different drivers โ€” each of whom thereby retains route knowledge as ordinary rostered work. 3. The candidate here is the 23:12 Westmoorโ€“Caldreth, Saturdays (average loading 31). Via Ennerly it takes 9 minutes longer, arrives inside its last connection, and calls at four stations that have nothing at that hour. Cost: nil in relief, instructor time, paths or units. The driver is on duty. The unit is in traffic. ยฃ0. Journey time cost: 9 minutes ร— 52 = 468 minutes a year, about 242 passenger-hours. Equivalent capability bought as refresher rides: 52 rides a year, ยฃ21,424 โ€” and deferrable, which this is not, because you cannot defer a booked passenger service to cover a shortage; it is the thing shortages are covered for. Effect on the register: 19 โ†’ 26, above the policy minimum of 24, maintained indefinitely, with no annual decision for anybody to take.

One train a week, nine minutes longer, nought pounds.

โ–

Why it works and a refresher programme does not

Because of where it sits in the queue.

A refresher ride is the most deferrable thing in the company. It is not a passenger service, nobody is waiting for it, and when Thursday is short of drivers it is the obvious thing to move โ€” correctly, sixty-nine times.

A booked passenger working is the least deferrable thing in the company. It is the thing other things get deferred in order to protect. It has a path, a unit, a crew diagram and passengers on it.

So the proposal does not ask anybody to prioritise route knowledge over service delivery. It makes route knowledge a by-product of service delivery, which is exactly the arrangement that held two hundred and fourteen names on the register for fifteen years without anybody deciding anything.

โ–

It is not a new idea. It is the old one, written down

That is the part I would put to a board. I am not proposing something the railway has never done.

Until December 2028 we did precisely this, by accident, and it worked perfectly, and it cost nothing, and the register stood at eighty-six per cent.

All I am asking is that the thing that was happening by luck should happen on purpose, so that the next time Service Planning re-paths a train for nine minutes โ€” and they should, and they will โ€” the competence does not leave with it.

โ–

Why it has to be in the timetable and not in my gift

Because anything in my gift is deferrable, and because I will retire too.

If this lives in a competence plan it is a line item that somebody reviews in three years. If it lives in the timetable it is a path, and paths are defended by a whole department whose job is defending paths, and it survives me, and it survives the next driver shortage, and it survives a change of Operations Director.

The strongest version of this proposal is the one that takes the decision away from me.

โ–

What Service Planning said

I took it to them in March. The answer was that a nine-minute change to one Saturday working goes into the December 2035 timetable, that the bid date is June, and โ€” this is a direct quotation โ€” that is the easiest thing anybody has asked us for this year.

All 18 chapters · Route Knowledge

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.