WHAT THE PROPOSAL WOULD NOT DO (R. L. FRAYNE โ applied to the 23 occasions) Would not have made the loop carry the main line service. 22 miles at 50 mph, single-track in places: about 1.5 trains an hour against a booked 4. On the best day we ever had, 12 services ran against 29 cancellations. Would not have prevented a single blockage. The landslip, the overhead failure, the trespass, the bridge strike โ all 23 still happen. Would not have got a train away at 06:38 on 7 November 2034 with certainty. With 26 on the register instead of 19, the effective figure at 06:00 rises from about 1.4 to about 2.2. That is probably one driver and it is not a guarantee. Would not fix the pilotman resource, the instructor bottleneck, or the fact that we are four drivers short most Wednesdays. Would not have helped the 9,400 passengers of 7 November 2034, who are already on the buses and in the past. What it would do: convert nought-out-of-seventeen into something-out-of-seventeen, at ยฃ0, and stop the same thing happening on the other two designated diversionary routes, whose registers I have now looked at and which stand at 31 and 44 and are falling.
I am not fixing the railway. I am fixing a thing that leaked away because nobody owned it.
The honest ceiling on this
A diverted service is a poor service. About one and a half trains an hour where there should be four, nine minutes longer, calling at platforms designed for two-coach locals.
Anybody who has been through a diversion knows it is a long day for everybody and that some passengers would have been quicker on a bus. I am not promising a good railway on a bad day. I am promising a railway.
And it is a probability, not a guarantee
This is where I have to be careful, because the temptation is to write that twenty-six drivers would have had a train away by seven o'clock.
They would not necessarily. Twenty-six on the register is about two point two effective at six in the morning, and two point two has a nought in its distribution. There will be a morning with twenty-six names and no driver, and if that morning comes somebody will produce this chapter and say the proposal failed.
It would not have failed. It would have moved the odds, every day, for nothing, which is the only kind of improvement available at this cost.
The two I had not looked at
The thing that frightened me after I wrote Chapter One was looking at the other two.
We have three designated diversionary routes. I had only ever counted the Ennerly loop because it is the one that was in the news in November. The other two stand at 31 and 44, and both are falling, and in both cases the booked workings that sustained them are thinner than they were.
Neither is at nineteen yet. Both are on the same slope, at about the same gradient, for the same reason, and it will take about six years each.
That is the argument for a rule rather than a fix. I can go and schedule rides on the Ennerly loop tomorrow and I will have solved this one route for as long as I am in post.