TIMETABLE โ DECEMBER 2031 CHANGE Up and Down Semerstone line: running time SemerstoneโCarr Moss increased by 3 minutes 30 seconds to reflect the permanent 20 mph restriction at SEM/142 Netherfold. Consequential: 06:47 Semerstone departure retimed to 06:44. Connection at Carr Moss for the 07:58 no longer achievable; next connection 09:02. Status: absorbed.
Absorbed. That is the word the timetable planners use, and it is exactly right, and it is the worst thing that happened at Netherfold.
What absorption means
In May 2031 the 20 mph restriction caused delay: trains ran late against their booked times, the delay appeared in the performance figures, and somebody had to explain it every four weeks.
In December 2031 the timetable was rewritten to include the restriction. From that date, trains crossing Netherfold at 20 mph were on time. The delay did not stop; it was taken out of the performance figures and built into the schedule, where it stopped being delay and became duration.
A problem that has been absorbed into the timetable has been solved, from the point of view of every system that measures timetables. Our figures for the Semerstone line improved in Period 10 of 2031/32. They improved because the journey got longer.
What it cost the people on the 06:47
The 07:58 from Carr Moss went to the city and arrived at 08:41. The 09:02 arrives at 09:45.
For anyone who had been making that connection โ and a conductor I spoke to put it at twenty to thirty people a morning โ December 2031 did not cost three and a half minutes. It cost sixty-four, five mornings a week, from that December until the restriction came off and the connection came back.
I have not included those sixty-four minutes anywhere in my figures. My figure of eleven point nine million pounds is built from three and a half minutes a train, because that is the number the delay regime recognises, and the collapsed connection is a different kind of harm that the regime does not price at all.
The real cost of Netherfold is larger than the number I am going to give you, and I am giving you the small version because it is the version I can defend.
Mark Tilsey
A driver, twenty-two years on the route, who said the thing that made me start writing this.
He said: "I've been doing twenty over that bridge so long I'd forgotten it was temporary. When they lifted it in November I nearly took it at twenty anyway. You stop noticing."
Twenty-two years of driving and eighteen months of a temporary restriction is long enough that the restriction becomes the route. Nathan stopped asking. The timetable stopped recording it as delay. Mark stopped noticing it.
By the middle of 2032, SEM/142 Netherfold was not a problem with a bridge. It was the way the line worked โ and the only person left who thought of it as a defect awaiting repair was me, and I had a possession date, which meant I thought about it twice a year.