ENVIRONMENTAL PERMIT EPR/HB3140 โ HAZELBY SEWAGE TREATMENT WORKS Operator: Carrowdale Water. Receiving water: River Dolver. Limits (final effluent): ammoniacal nitrogen 3 mg/l (95-percentile); BOD 15 mg/l; suspended solids 30 mg/l. Monitoring: 24 spot samples per year, taken by the operator, analysed by an accredited laboratory, results returned quarterly.
COMPLIANCE RECORD, three years to August 2034 Samples: 72. Exceedances: 0. Compliance: 100%.
INCIDENT 34/1190 โ River Dolver, 13 August 2034 Dissolved oxygen at Dolver Bridge: 8.4 mg/l falling to 1.2 mg/l between 02:10 and 07:20. Fish killed: approximately 4,100 over 2.8 km. Species: brown trout, bullhead, minnow, three eels. Nearest effluent sample: 12 days before. Next: 9 days after.
Those three documents are the whole of this account, and all of them are accurate.
The works was fully compliant with its permit on the day the river died, and had been for three years, and remains so now. Nobody falsified anything. The laboratory is accredited, the samples were taken on the dates they should have been taken, and the results are what they are.
Who I am
Gareth Marwood. I am forty-nine and I am an environment officer in a water quality team, which means I write permits for discharges to rivers, assess whether operators comply with them, and attend incidents when something goes wrong.
Two hundred and twelve consented discharges in my patch. Nine of them have continuous monitoring. Two hundred and three are assessed by spot samples, in the same way Hazelby is.
I attended the Dolver on the morning of 13 August 2034 and walked two and a half kilometres of it, and I have been doing this for twenty-two years and I have never seen anything like it.
The Dolver
A small river. Twenty-two kilometres, rising on the escarpment, joining the Nenn below Carrowby. At Dolver Bridge in August it is perhaps four metres wide and knee-deep, running over gravel.
It is a designated fishery and has been since 1996, which is why it has a telemetry monitor at the bridge โ one of six in my area. The reach below Hazelby held a self-sustaining brown trout population, which in a lowland river in this county is not common and is the thing local people are proudest of.
In 1974 it had no fish in it at all below the works. The recovery took twenty years and three successive tightenings of the permit, and the people who did that work are mostly retired and some of them still fish it.
That is the context in which an angler stood in the water on a Sunday morning in August 2034 and asked me whether the sewage works was allowed to do this.
The sentence this is about
The works was compliant.
A permit sets a number that effluent must not exceed, and compliance is assessed against samples. Twenty-four samples a year, each of them a litre of water taken at an instant.
Twenty-four instants, in a year that contains thirty-one and a half million seconds. By duration, the permit measures something in the region of eight thousandths of one per cent of the year, and declares a verdict about the other 99.99 per cent.
That is not a scandal and it is not laziness. It is what a measurable, enforceable limit has to look like, for reasons I will spend three chapters on, and I have written forty permits in that form myself and would write them again tomorrow.
It also means that compliance is a statement about the samples, and the river is a statement about the water, and those two things are related but they are not the same thing โ and on a night in August nothing whatever connected them.