Books › Within Permit
Within Permit ยท a novel

Chapter TwoTwo Halves That Never Meet

Chapter 2 of 183 min read620 words

ROLE โ€” ENVIRONMENT OFFICER (WATER QUALITY) Determine applications for environmental permits for water discharge activities; set conditions and limits appropriate to the receiving water; assess operator compliance; investigate reported pollution incidents; advise on enforcement.

Two halves of the job, and they are performed with different instruments, which is the first thing worth understanding.

Compliance is desk work. Quarterly returns arrive from operators, numbers are compared against limits, and a works is compliant or it is not. I do that for two hundred and twelve discharges from a desk in a business park.

Incidents are field work. Somebody rings โ€” an angler, usually, or a dog walker โ€” and I go, and I look at water, and I take samples, and I walk the bank counting dead things.

Those two halves almost never meet. In twenty-two years I can think of four occasions where an incident I attended was connected, evidentially, to a compliance failure I could demonstrate. Four.

โ–

What the permit is for

It is worth being clear, because the easy reading of this book is that permits are a fiction.

A permit is the instrument that stopped British rivers being open sewers. Before consented discharges with numeric limits, a works discharged what it discharged and the only remedy was a common law action by a riparian owner, which meant the only protected rivers were the ones flowing past somebody wealthy.

The numbers in EPR/HB3140 are not generous. Three milligrams of ammonia per litre is a demanding standard that requires a works to be run properly every day, and Carrowdale spent four million pounds on Hazelby in 2030 to meet it. The permit works. The Dolver in 1974 had no fish in it at all; it had a brown trout population in 2034 because of permits like this one.

What I am describing is not a sham. It is an instrument that did an enormous amount of good and has a specific blind spot that is structural rather than accidental.

โ–

The four occasions

I said the two halves of the job almost never meet, and it is worth saying what it takes for them to.

A dairy in 2009 washing a yard into a ditch during a routine sampling visit โ€” I was standing there. A fish farm in 2014 where the incident was continuous and still running when I arrived, so the sample I took at the outfall was the evidence. A metal finisher in 2019 whose discharge was visibly coloured for three days. And a works in 2022 that was so plainly failing that the routine samples either side of the incident were both over the limit.

In all four the event was either long enough to still be happening when somebody arrived, or so persistent that the routine regime caught it anyway.

Every one of them was an event that lasted longer than the gap between a report and an officer. None was five hours in the middle of a Sunday night.

โ–

Why I am writing this

Because the permit comes up for review and because of one night in August, and because of a sentence I have said to members of the public perhaps two hundred times and could not say on the thirteenth.

An angler at Dolver Bridge asked me, standing in the water in waders at ten in the morning with dead trout going past him, whether the sewage works was allowed to do this.

I said that the works was compliant with its permit. He asked whether that was the same as it not having done it.

I said no. He asked what the difference was, and I have spent fourteen months writing this because the honest answer takes eighteen chapters.

All 18 chapters · Within Permit

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.