STORM OVERFLOW โ HAZELBY STW, permit condition 4 The overflow at the inlet works may discharge only when the flow arriving at the works exceeds Formula A (6 ร dry weather flow), and the works is passing forward the maximum it is designed to treat. Event duration monitoring: in place. Spill record, August 2034: 61 hours, 7 spills, all during or following rainfall, all within permitted conditions.
A storm overflow is the thing the public has heard of and the thing that is least like what they imagine.
It is a relief valve. When more flow arrives at a works than the works can treat โ in a combined sewer, when it rains โ something must give. Either the excess is discharged, dilute, to the river, or it backs up through the system and comes out of the lowest point in the network, which is somebody's downstairs lavatory.
The overflow exists so that the second thing does not happen. That is not a convenience for the water company. It is the reason the permit allows it, and if you removed the permission without rebuilding the sewers you would be choosing sewage in houses over sewage in rivers.
The thing I have to keep explaining
Sixty-one hours of spill in a month sounds like a scandal and may well be one in the aggregate, nationally. In this specific investigation it is not the answer, and I have had to say so to three people who did not want to hear it.
The spills in August were during or following rainfall, which is what the condition permits. The last one ended on 9 August. There had been no rain since. The overflow did not operate on the night of the twelfth or the morning of the thirteenth, and that is established by the event duration monitor, which is one of the few things at Hazelby that does record continuously.
So the component of the works that everybody assumes is the culprit is the one component with a continuous record, and the record exonerates it.
Which leaves the thing with no record
The final effluent. Continuous, permitted, sampled twenty-four times a year on Wednesday mornings.
The irony of that is not lost on anybody who works in this field. We have spent a decade putting event duration monitors on storm overflows, correctly, because spills were invisible and are now counted. The result is that the exceptional discharge is now the best-documented thing at a sewage works and the ordinary one is still assessed by twenty-four litres a year.
Nobody chose that either. Monitoring followed public attention, public attention followed the word sewage, and the continuous discharge that runs every second of every day does not have a name that alarms anybody.