CARROWDALE WATER โ PROCESS DATA, HAZELBY STW, 12โ13 August 2034 (provided 13 August, 12:40) Inlet flow: normal, 3,900โ4,400 mยณ/d throughout. No storm operation. Final effluent flow: continuous, normal. Return activated sludge pumps 1 and 2: running. Pump 3: out of service since 29 July (impeller, parts on order). Dissolved oxygen in aeration lane 2: 1.1 mg/l at 23:40, 12 Aug, recovering 04:00 (setpoint 2.0). Sludge blanket, final settlement tank 1: rising from 21:00, 12 Aug; peak 1.9 m at 03:30, 13 Aug (normal < 1.0 m). No alarm configured on sludge blanket depth.
They gave me all of that within three hours of my asking, unprompted and without a solicitor. I want that recorded because the next four chapters are about a company that is not prosecuted and it would be easy to assume obstruction.
What the data shows, to somebody who runs works
A settlement tank with a rising sludge blanket, peaking at half past three in the morning, two and a half hours into a dissolved oxygen crash in the river two kilometres downstream.
A sludge blanket that rises to 1.9 metres in a tank designed to hold it below one metre is a tank that is close to carrying solids over the weir. Solids over the weir means activated sludge โ biological material, highly oxygen-demanding โ going out in the final effluent, not as a spill, not as a storm discharge, but through the normal outfall as ordinary treated effluent that happens for a few hours not to be treated.
That is the shape that matches the river. Onset, five hours, sharp recovery.
The pump
Return activated sludge pump 3 failed on 29 July. The impeller needed replacing; the part was on order; the works ran on two of three pumps for fifteen days including the hottest week of the year.
Running on two of three is not a breach of anything. The permit does not specify plant availability, and it could not sensibly: a condition requiring every pump to work at all times would be breached by every maintenance operation at every works in the country.
It is also not negligent in any way I could establish. The part was ordered the day the pump failed; I have the purchase order. The supplier quoted eighteen days. Carrowdale's operations manager told me he had considered hiring a temporary pump and judged it unnecessary because the works was holding its limits โ which it was, and the routine sample on 1 August is the proof he was relying on.
So a man made a defensible operational judgement on 29 July, supported by the monitoring regime's own evidence, and fifteen days later the warmest night of the year arrived with two pumps and a rising blanket.
Why it is not proof
Because a rising blanket is not a measurement of what went over the weir. It is a measurement of where the sludge was in the tank.
There is no instrument on that outfall. Nothing recorded the quality of what left Hazelby between midnight and six on 13 August, and nothing was required to. The only effluent measurement in that fortnight is a litre taken at 11:25 on the thirteenth, nine hours late, and one taken on 1 August, twelve days early.
So I have: a plausible mechanism, a plant running with one of three sludge return pumps out for a fortnight, a depressed aeration DO overnight, a blanket at nearly twice its normal depth at exactly the right hour, and a river two kilometres downstream losing its oxygen.
And no sample. The whole of this book is in the space between that paragraph and the previous one.