MY PATCH โ€” consents and monitoring, 2035 Consented discharges: 212. With continuous effluent monitoring: 9. Spot-sampled only: 203. The 9: three large works above 50,000 population equivalent; four industrial consents with specific hazardous determinands; two where continuous monitoring was imposed after an incident. Substantiated pollution incidents, year to August 2035: 37. Prosecutions: 2 โ€” both for unpermitted discharges. Neither for a permitted works.

Two out of thirty-seven, and both of those were people discharging without any permit at all โ€” a car wash into a surface water drain, and a contractor pumping a flooded basement into a beck.

The ones with permits are not prosecuted, and the reason is not that they are better behaved. It is Chapter Ten: a permitted discharge is assessed against a sample, and if there is no sample from the event there is no offence to prove, and the general pollution offence founders on source attribution.

A permit, among everything else it does, is a very effective defence against prosecution for anything that happens between samples. Nobody designed it as one. It is a by-product of the limits being enforceable, which is the thing that makes them work the rest of the time.

โ–

The two that got continuous monitoring after an incident

This is the pattern I most want somebody to look at.

Both of those consents had continuous monitoring imposed as a permit variation following a pollution incident that could not be proved. In each case the investigation closed with no action for want of evidence, and the regulatory response was to require the instrument that would have provided it.

So the sequence is: a works kills a river, the absence of monitoring prevents enforcement, and the enforcement outcome is monitoring. Which is sensible โ€” it is the only response available and it prevents the next one โ€” and it means continuous monitoring is in practice a sanction, imposed after a death, rather than a condition of operating.

Hazelby did not get it, because the investigation found no fault, and a permit variation imposing several tens of thousands of pounds of monitoring on an operator against whom nothing was established would be appealed and would probably fall.

โ–

What 203 means in practice

Two hundred and three discharges, running continuously, assessed between twelve and twenty-four times a year each, almost all on weekdays in working hours.

I have no idea how many five-hour events occur across those 203 outfalls in a year, and neither does anybody, and that is not a gap in my knowledge โ€” it is a property of the instrument. The events are only detected where a river monitor happens to be downstream and a fish kill happens to be visible, which requires the event to be large, in daylight hours or near a bridge somebody walks over, and in a reach with fish worth counting.

The Dolver has a monitor because it is a designated fishery. Most of my 203 outfalls discharge into watercourses with no monitor of any kind.