Books › In Perpetuity
In Perpetuity ยท a novel

Chapter ThreeCondition 23

Chapter 3 of 182 min read560 words

PLANNING PERMISSION 19/0412/MAJ โ€” THORNMERE RIVERSIDE, 14 OCTOBER 2019 Condition 23: No dwelling shall be occupied until it has been connected to the site-wide communal heat network. The network shall serve all phases of the development and shall be maintained in perpetuity. Reason: to secure the carbon reduction required by Policy CC2 of the adopted Local Plan, the applicant's Energy Statement having demonstrated that a site-wide heat network achieves a 37% reduction in regulated carbon emissions against individual gas boilers. Section 106 agreement, clause 8.4: the Owner shall procure that each lease of a dwelling contains a covenant requiring connection to and payment for heat from the Network.

I want to defend condition 23 before I spend fifteen chapters describing what it did, because everybody who writes about heat networks skips this part and the skipping is why nothing gets fixed.

โ–

It was the right condition

In 2019, on a riverside brownfield site consented for fourteen hundred and twenty homes, the options were fourteen hundred and twenty individual gas boilers or one network.

The network wins on carbon, decisively and measurably, and the thirty-seven per cent in the reason is not a developer's optimism โ€” it is a modelled figure that my predecessors' engineers produced and that the council's consultant checked. It also wins on air quality, on maintenance, on fire risk, on plant rooms rather than flues, and on the ability to decarbonise later: you can replace one energy centre with heat pumps, and you cannot replace fourteen hundred boilers.

The officer who drafted condition 23 was doing good work and I would have advised her to draft it.

โ–

Why the perpetuity clause is there

Because a network with a right to leave is not a network.

If residents may disconnect, the fixed costs fall on whoever remains, which raises their charge, which makes leaving more attractive, which raises the charge again. That spiral is not hypothetical; it has destroyed small schemes. Any lender financing an energy centre will require the connection obligation, and without a lender there is no energy centre.

So in perpetuity is not a trap somebody set. It is the structural condition for the thing existing at all, and the officer, the developer, the lender and I all understood that, and we were all correct.

โ–

What the condition does not say

It does not say how many homes the network's economics assume.

The Energy Statement says fourteen hundred and twenty. The carbon calculation uses fourteen hundred and twenty. The pipe sizing, the plant selection, the loan and the thirty-year cash flow all use fourteen hundred and twenty. The number is everywhere in the file and nowhere in the permission, and the permission is the only document that binds anybody.

Condition 23 requires the network to serve all phases. It does not require all phases to exist.

โ–

What happens when they do not

Nothing happens. That is not a figure of speech.

There is no provision in the permission, the section 106 agreement, the concession, the leases or any regulation then in force which is triggered by the development being a third built. No review, no notice, no recalculation, no named person who must look at it.

The condition continues to bind the four hundred and twelve dwellings that exist, in perpetuity, to a network sized for a development that does not.

All 18 chapters · In Perpetuity

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.