Books › In Perpetuity
In Perpetuity ยท a novel

Chapter FiveFour Hundred and Twelve

Chapter 5 of 182 min read560 words

SCHEME STATUS โ€” THORNMERE RIVERSIDE, 1 SEPTEMBER 2033 Phase 1 (184 dwellings): complete, occupied 2021โ€“22. Connected. Phase 2 (228 dwellings): complete, occupied 2022โ€“23. Connected. Primary school (1,100 mยฒ heated): complete 2022. Connected. Leisure centre (2,400 mยฒ): complete 2023. Connected; closed by operator March 2030; heat account terminated. Phase 3 (560 dwellings): consented, reserved matters approved 2023. Not commenced. Developer Calderhaye Developments Ltd โ€” administration, 11 March 2024. Phase 4 (448 dwellings): land sold to unconnected party 2026. Consent lapsed 14 October 2027. Connected dwellings: 412 of 1,420 (29%). Connected annual heat delivery: 4,950 MWh of a design 17,400.

Twenty-nine per cent of the homes and twenty-eight per cent of the heat, carrying one hundred per cent of the fixed cost. That is the scheme, in one extract, and the rest is consequences.

โ–

What happened to Calderhaye

Nothing dramatic and nothing improper. A mid-sized housebuilder with four sites, two of which were viable and two of which were not, which ran out of working capital in the winter of 2023 and went into administration in March 2024.

The administrators sold phase 3's consent with the land in 2025 to a company that has done nothing with it, and sold the phase 4 land in 2026 to a buyer who let the consent lapse and has since applied, unsuccessfully, for a logistics shed.

I have read the administrators' progress reports โ€” all five of them โ€” looking for somebody who should have thought about the heat network, and the honest answer is that an administrator's duty is to the creditors of Calderhaye Developments Ltd, and the four hundred and twelve households at Thornmere Riverside are not creditors of Calderhaye Developments Ltd.

They are not anybody's creditors. That is the whole difficulty: they have no claim against anyone, because nobody promised them anything that has been broken.

โ–

What the leisure centre did

It is worth a paragraph because it is the only thing in this story that got out, and how it got out is instructive.

The leisure centre was a commercial operator on a lease with a heat supply agreement, not a residential lease with a covenant. When its standing charge reached forty-one thousand pounds a year it did what any commercial tenant does: it compared, it complained, it threatened, and in March 2030 it closed the building and terminated the account, which it was entitled to do on six months' notice.

Its fixed-cost share โ€” about eighty thousand pounds a year โ€” did not vanish. It moved onto the four hundred and twelve, which is the spiral I described in Chapter Three, running in real life, at small scale, in front of me.

โ–

The school

Still connected, because its heat is procured by the county council under an agreement I would describe as generous to the school and which my predecessor signed in 2021 to get an anchor load.

The school pays a fixed annual sum of twenty-two thousand pounds, index-linked, for heat that costs the network about fifty-one thousand pounds to deliver.

I am not going to pretend to be upset about a primary school's heating bill. I am pointing out that the only two non-residential connections on this network are one that left and one that pays under cost, and that the residual, in both cases, lands in the same place.

All 18 chapters · In Perpetuity

Use the ← and → arrow keys to turn the page. Your place is kept in this browser.