FIXED COST BUILD-UP, 2033/34 — THORNMERE RIVERSIDE HEAT NETWORK Senior debt service (2020 loan, £14.8m over 25 years at 4.1%): £640,000 Operation and maintenance (plant, mains, controls, call-out): £410,000 Metering, billing and credit control: £140,000 Insurance, statutory inspection, highway indemnities: £120,000 Total fixed cost: £1,310,000 Connected dwellings: 412. Non-residential contribution (school, fixed): £22,000. Fixed cost per dwelling after non-residential contribution: £3,126.
Three thousand one hundred and twenty-six pounds per flat per year before anybody turns a radiator on. That is the number the contract entitles my company to charge, and it is the number I do not charge, and the distance between those two facts is the rest of this chapter.
There is nothing hidden in that build-up
I have had it audited twice, once by my company and once, in 2031, by a consultant appointed by the residents' association, whose report I will come to and whose arithmetic agreed with mine to within nine thousand pounds.
The debt service is a loan agreement. The operation and maintenance is a contract with a maintainer, competitively retendered in 2029, which came in four per cent lower than the previous one. The metering and billing is a per-meter charge from a third party. The insurance is the premium.
There is no profit in the fixed cost. There is no management fee being inflated. There is no related-party contract. I say this because every article written about heat networks assumes there is, and at Thornmere Riverside the absence of villainy is the interesting thing: the charge is extortionate and nobody is extorting.
What the same build-up looks like fully loaded
Run it with fourteen hundred and twenty dwellings instead of four hundred and twelve.
The fixed cost rises, but not proportionately — debt service does not move at all, insurance and statutory barely move, and operation and maintenance rises by perhaps a hundred and sixty thousand because there is more plant running and more heat being delivered. Call it one million four hundred and seventy thousand pounds.
Divide by fourteen hundred and twenty: one thousand and thirty-five pounds. And the unit rate falls too, because the CHP engines run at their design load instead of cycling, so the heat they produce is cheaper per kilowatt-hour.
My own modelling, which I did in an evening in 2030 and have never been asked for, puts the fully-loaded scheme at a standing charge of about £1,035 and a unit rate of about 8.4 p/kWh.
Against a gas standing charge of £109 and 7.1 p/kWh, that is roughly the same money. Which is what the Energy Statement said in 2019, and the Energy Statement was right, and the scheme as consented was a fair deal.
So where did the money go?
It did not go anywhere. Nobody has it.
Seventy-one per cent of the connections that were supposed to share one million three hundred and ten thousand pounds of fixed cost do not exist. The cost did not reduce, no party took a windfall, and the difference is not sitting in anybody's account.
It is sitting on four hundred and twelve electricity bills and in eight hundred and forty thousand pounds a year of my company's losses, and that is the entire explanation. There is no third place for it to be. A fixed cost divided by a smaller number is a bigger number, and that sentence is the only mechanism at work in this book.